Specification |
Grade: SS400-SS490;
Standard: AISI, JIS, ASTM, DIN, BS, GB;
Material: Q235, Q345, Q235B, Q355b, S355jr, Ss400, etc.;
Shape: I-Shaped;
Technique: Hot Rolled;
Type of Steel: High-Strength Steel;
Width: 100-630mm;
Height: 68-180mm;
Thickness: 4.5-17mm;
Application: Building, Steel Structure, Steel Workshop, etc.;
|
Grade: A36 Q235B Q235 Q345;
Standard: AISI, JIS, ASTM, DIN, BS, GB;
MOQ: 5 Tons;
I Beam Specification: 10#-30#;
Flange Width: 50-400mm;
Flange Thickness: 8mm-64mm;
Web Width: 100mm-900mm;
Shape: Beam Shape;
Alloy or Not: Non-Alloy;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Material: 235/Q345/Ss400/St37-2/St52/Q420/Q460/S235jr;
Key Words: Steel Building Materials I-Beam;
Certificate: ISO9001;
Application: Construction;
Surface: Natural Surface or Galvanized;
Delivery Time: 7-25 Working Days After Deposit;
Orther Service: SGS Testing;
|
Grade: A36 Q235B Q235 Q345;
Standard: AISI, JIS, ASTM, DIN, BS, GB;
MOQ: 5 Tons;
Length: Support Customization;
Width: Support Customization;
Thickness: Support Customization;
Processing Service: Cutting, Bending, Punching, Marking, etc;
Oiled or Non-Oiled: Non-Oiled or Customization;
Delivery Time: 7-35 Weekdays;
|
Grade: A36 Q235B Q235 Q345;
Standard: AISI, JIS, ASTM, DIN, BS, GB;
MOQ: 5 Tons;
I Beam Specification: 10#-30#;
Flange Width: 50-400mm;
Flange Thickness: 8mm-64mm;
Web Width: 100mm-900mm;
Shape: Beam Shape;
Alloy or Not: Non-Alloy;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Material: 235/Q345/Ss400/St37-2/St52/Q420/Q460/S235jr;
Key Words: Steel Building Materials I-Beam;
Certificate: ISO9001;
Application: Construction;
Surface: Natural Surface or Galvanized;
Delivery Time: 7-25 Working Days After Deposit;
Orther Service: SGS Testing;
|
Grade: S235JR-S355J2;
Standard: AISI, JIS, ASTM, DIN, BS, GB;
Product Name: I-Beam;
Wb Height: 100-600 mm or as Required;
Length: 1-12m or as Required;
Tolerance: +/-5%;
Usage: Construction Structure,Transmission Towers;
Technique: Hot Rolled / Welding;
Delivery Time: About 7-15 Days;
MOQ: 1 Ton;
|