Specification |
Application: Machinery Accessory;
Standard: GB, EN;
Surface Treatment: Polishing;
Production Type: Mass Production;
Machining Method: CNC Turning;
Material: Brass, Copper;
Part Name: CNC Turning Copper Parts;
Size: Customized Size;
Roughness: Customizable;
Packaging: Carton;
Style: CNC Machining/CNC Turning;
Drawing File: Step, STP,Dwg;
Tolerance: (+/-0.05mm);
Sample Service: Avaiable;
Machines: CNC Machines,CNC Lathe Machines;
Logo Service: Customizable;
|
Surface Treatment: Anodizing;
Production Type: Mass Production;
Machining Method: Forging;
Material: Aluminum;
Deep Process: Cold Drawing, CNC, Cutting, Sawing, Drilling, Mill;
MOQ: 300kgs;
Delivery Time: 10-15days;
Hardness: 50-300hb;
Finish Treatment: Anodizing/Powder Coated;
Payment Terms: 30%Tt Deposit,70%Balance Against Bl Copy;
Extruding Machine: 660-3000tons;
|
Surface Treatment: Anodizing;
Production Type: Mass Production;
Machining Method: Forging;
Material: Aluminum;
Deep Process: Cold Drawing, CNC, Cutting, Sawing, Drilling, Mill;
MOQ: 300kgs;
Delivery Time: 10-15days;
Hardness: 50-300hb;
Finish Treatment: Anodizing/Powder Coated;
Payment Terms: 30%Tt Deposit,70%Balance Against Bl Copy;
Extruding Machine: 660-3000tons;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Brushed;
Production Type: Batch Production;
Machining Method: CNC Turning;
Material: Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Process Flow: Turning, Threading, Clean, Plating, Packing;
Samples: Available;
Lead Time: 8-13 Days;
Samples Lt: 5-8 Days;
|
Application: Fastener, Auto and Motorcycle Accessory, Hardware Tool, Machinery Accessory;
Standard: GB, EN, API650, China GB Code, JIS Code, TEMA, ASME;
Surface Treatment: Brushed;
Production Type: Batch Production;
Machining Method: CNC Turning;
Material: Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron;
Process Flow: Turning, Threading, Clean, Plating, Packing;
Samples: Available;
Lead Time: 8-13 Days;
Samples Lt: 5-8 Days;
|