New Steel Automatic Coating Line for Metal Furniture

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$90,000.00-130,000.00 / Set

Sepcifications

  • Type Coating Production Line
  • Coating Powder Coating
  • Substrate Steel
  • Certification CE, ISO
  • Condition New
  • Transport Package Paper Box
  • Specification 15 t
  • Trademark Fuyuan
  • Origin Huzhou
  • Pretreatment Dipping Type
  • Conveyor Guangda
  • Powder Booth Material PP Plate
  • Burner Brand Riello

Product Description

New Steel Automatic Coating Line for Metal Furniture Conveyor system in powder coating line: No. Item Parameter 1 Model QXG-250 2 Technical speed 2.0 m/min 3 Overall length ~180 m 4 Chain pitch 250 mm 5 Chain single point loading 50 KG 6 Hanger spacing 500 mm 7 Railway ...

Learn More

Production Line Comparison
Transaction Info
Price US $ 90,000.00-130,000.00/ Set US $ 14,500.00-38,500.00/ Piece US $ 80480/ Set US $ 80480/ Set Negotiable
Min Order 1 Sets 1 Pieces 1 Sets 1 Sets 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T, D/P, Paypal L/C, T/T L/C, T/T L/C, T/T, Western Union, Money Gram
Quality Control
Product Certification CE, ISO CE, ISO CE, ISO CE, ISO ISO, SGS
Management System Certification ISO 9001 ISO 9001, ISO 9000, ISO 14001, ISO 14000, SA 8000 - - ISO 9001
Trade Capacity
Export Markets North America, Southeast Asia, Eastern Asia South America, Europe, Southeast Asia/ Mideast North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model Own Brand - - - OEM, ODM, Own Brand
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Pretreatment: Dipping Type;
Conveyor: Guangda;
Powder Booth Material: PP Plate;
Burner Brand: Riello;
After-sales Service: Provide;
Warranty: 2 Years;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Warranty: 1 Year;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Control Type: Full Closed-Loop PLC Control;
Input Power: 5000W;
Kerosene Pressure/Flow: 1.2MPa;
Oxygen Pressure/Flow: 1.6MPa;
Warranty: 1 Year;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Control Type: Full Closed-Loop PLC Control;
Input Power: 5000W;
Kerosene Pressure/Flow: 1.2MPa;
Oxygen Pressure/Flow: 1.6MPa;
Type: Aluminum Work Table;
Coating: Customized;
Substrate: Aluminum;
Condition: New;
OEM/ODM: Yes;
Supplier Name

Zhejiang Deqing Fuyuan Smart Equipment Technology Co., Ltd.

China Supplier - Gold Member Audited Supplier

Hebei Hanna Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhengzhou Lijia Thermal Spray Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Zhengzhou Lijia Thermal Spray Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Hunan Hua-Alu Machinery Technology Co., Ltd.

China Supplier - Gold Member Audited Supplier