Electrostatic Powder Coating Equipment for Automatic Spraying

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$198,000.00-318,000.00 / Set

Sepcifications

  • Type Coating Production Line
  • Coating Powder Coating
  • Substrate Steel
  • Certification CE, ISO
  • Condition New
  • Transport Package Air Bubble Film
  • Specification 15 t
  • Trademark Fuyuan
  • Origin Huzhou
  • Pretreatment Spraying
  • Electric Control Simens

Product Description

Electrostatic Powder Coating Equipment For Automatic Spraying Powder coating process: 1. Pretreatment: Dipping pretreatment with overhead crane, or fully automatic spraying pretreatment. 2. Conveying system: Closed-circuit conveyor, power and free conveyor, multi-track conveyor, and so ...

Learn More

Powder Coating Line Comparison
Transaction Info
Price US $ 198,000.00-318,000.00/ Set US $ 171400/ Set US $ 13432/ Set US $ 26000/ Set US $ 80000/ Set
Min Order 1 Sets 1 Sets 1 Sets 1 Set 1 Set
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification CE, ISO ISO CE, ISO CE, ISO CE, ISO
Management System Certification ISO 9001 ISO 9001, ISO 14001, OHSAS/ OHSMS 18001 - ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, Southeast Asia, Eastern Asia Europe, Southeast Asia/ Mideast, Australia North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - > US $100 Million - - -
Business Model Own Brand - - OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 3-6 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Pretreatment: Spraying;
Electric Control: Simens;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Model: 108-630;
Pipe Ranges: 108-630mm;
Extrusion Capability: 680kg/H;
Serives: One Year;
Pipe Style: PE;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Steel;
Condition: New;
Dust Removal Efficiency: 99.9% Collection Efficiency;
Type: Coating Production Line;
Coating: Vacuum Coating;
Substrate: Steel;
Condition: New;
Type: Coating Production Line;
Coating: Vacuum Coating;
Substrate: Steel;
Condition: New;
Supplier Name

Zhejiang Deqing Fuyuan Smart Equipment Technology Co., Ltd.

China Supplier - Gold Member Audited Supplier

Qingdao Huashida Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Zhengzhou Lijia Thermal Spray Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Wenzhou Cicel Vacuum Machine Co., Ltd.

China Supplier - Gold Member Audited Supplier

Wenzhou Cicel Vacuum Machine Co., Ltd.

China Supplier - Gold Member Audited Supplier