Clamp
US$0.30-5.80 / Piece
View
  • Recommend for you
  • What is Jbc Manufactured Line Fittings Waterproof Electrical Insulated Piercing Clamp
  • What is Insulation Piercing Quick Connector Terminal for Jbc-2 Power Transmission
  • How to Install Wenzhou Zhejiang China Insulation Piercing Wire Clamp Terminal Jjc1-35

How to Install Jbc-1 Carton Pack Wire Clamp for Connecting Terminal Power Line

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

5000 Pieces US$0.30-5.80 / Piece

Sepcifications

  • Technics Injection Molded Contact Parts
  • Standard GB
  • Usage Power Transmission
  • Type Connecting Terminal
  • Transport Package Carton
  • Specification Nylon shell
  • Trademark GGLDF
  • Origin Wenzhou, Zhejiang, China
  • Package Carton
  • Model Jbc-1
  • Use to Power Transmission
  • Classification Connecting Terminal

Product Description

Product Name: JBC Series Insulation Piercing Wire Clamp Keywords: Clamp, Puncture, No Stripping Wire, Connecting Terminal, Splitter, Insulation Piercing Introducing the JBC Series Insulation Piercing Wire Clamp, a cutting-edge solution for electric power fittings. This innovative clamp ...

Learn More

Clamp Comparison
Transaction Info
Price US $ 0.30-5.80/ Piece US $ 7.20-7.80/ Piece US $ 10.00-15.00/ Piece US $ 10.00-15.00/ Piece US $ 10.00-15.00/ Piece
Min Order 5000 Pieces 50 Pieces 50 Pieces 50 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms Corporate transfer L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets - Africa, Australia Africa, Australia Africa, Australia Africa, Australia
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - - - - -
Product Attributes
Specification
Technics: Injection Molded Contact Parts;
Standard: GB;
Usage: Power Transmission;
Type: Connecting Terminal;
Package: Carton;
Model: Jbc-1;
Use to: Power Transmission;
Classification: Connecting Terminal;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Technics: Welding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
Supplier Name

Yueqing Ganggu Power Fittings Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tangshan Dongfang Baode Trading Co., Ltd.

China Supplier - Gold Member Audited Supplier