2 Outlet Ne555 Delay Geya Extractor Fan MCB Timer Switch

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

20-49 Pieces US$14.11

50-199 Pieces US$13.23

200-499 Pieces US$12.45

500+ Pieces US$11.76

Sepcifications

  • Number of Switch Multi Control Switch
  • Protection IP53
  • Certification CCC, RoHS, ISO9001, CE
  • Type Mechanical
  • Transport Package Standard Transport Box
  • Specification 10min to 24H
  • Trademark GEYA
  • Origin Zhe
  • MOQ 20

Product Description

··········This link price is only for TB37 without battery without battery··········· Product Description Certifications Packaging &Shipping Company ...

Learn More

Programmable Wall Switch Comparison
Transaction Info
Price US $ 11.76-14.11/ Piece US $ 12.40-12.90/ Piece US $ 7.90-8.50/ Piece US $ 13.97-14.50/ Piece US $ 12.37-18.55/ Piece
Min Order 20 Pieces 500 Pieces 500 Pieces 500 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Paypal L/C, T/T, Paypal L/C, T/T, Paypal L/C, T/T, Paypal
Quality Control
Product Certification CCC, RoHS, ISO9001, CE CCC, ISO9001, CE CCC, ISO9001, CE CCC, ISO9001, CE CCC, ISO9001, CE
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, Europe, East Asia(Japan/ South Korea) North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Number of Switch: Multi Control Switch;
Protection: IP53;
Type: Mechanical;
MOQ: 20;
Number of Switch: Multi Control Switch;
Protection: ABS 94-V0;
Type: Electronic;
Load Power: 3*1000W;
Delay off Time: 30s;
Load Control: 3 Gang;
Wiring Scheme: L&N;
Input Voltage: 220V~240V;
Display: LED Indicator;
Number of Switch: Single Control Switch;
Protection: ABS 94-V0;
Type: Electronic;
Load Power: 2000W;
Delay off Time: 30s;
Load Control: 1 Gang;
Wiring Scheme: L&N;
Input Voltage: 220V~240V;
Display: LED Indicator;
Number of Switch: Multi Control Switch;
Type: Electronic;
Load Power: 4*500W;
Delay off Time: 30s;
Load Control: 4 Gang;
Wiring Scheme: L&N;
Input Voltage: 220V~240V;
Display: LED Indicator;
Number of Switch: Single Control Switch;
Protection: ABS 94-V0;
Type: Electronic;
Max. Voltage: 240V;
Timing: 1 Day;
Wiring Scheme: L&N;
Load Power: 2000W;
Timer Setting: Second;
Timing Periods Per Day: 20;
Supplier Name

Zhejiang Geya Electrical Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shenzhen Asia Bright Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shenzhen Asia Bright Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shenzhen Asia Bright Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shenzhen Asia Bright Co., Ltd.

China Supplier - Diamond Member Audited Supplier