Magnetic Formwork-System
US$380.00-400.00 / Piece
View
  • Recommend for you
  • What is Precast Concrete Connection Wire Rope Loop Box for Building Construction
  • What is Shuttering Magnets for Pre-Cast Concrete Formwork
  • What is Rubber Recess Former for Spherical Head Lifting Anchors

What is Shuttering Magnetic System Magnetic Formwork-System

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$380.00-400.00 / Piece

Sepcifications

  • Application Cunstruction Build; Industrial Magnet
  • Certification CE, ISO, SGS
  • Surface Treatment Yes
  • Technics Casting
  • Material Steel
  • Type Fasteners
  • Transport Package Wooden Packing, Carton, Anti-Magnetizing Packing
  • Specification Customized
  • Trademark GME
  • Origin China
  • Product Name Formwork Magnet Precast Concrete Magnet
  • Transportation by Sea, by Air, by Express
  • Lead Time 7-15 Days

Product Description

How to buy precast concrete magnetic formwork side mold? 1. Offer Technical drawing of the Precast Concrete Magnetic Formwork, We will produce the magnetic formwork as per your drawing. 2. If no drawing, please choose the items for U-profile MagSwing Shuttering Magnetic System. 3. We specially ...

Learn More

Magnetic Formwork-System Comparison
Transaction Info
Price US $ 380.00-400.00/ Piece US $ 2.20-2.26/ Piece US $ 2.20-2.26/ Piece US $ 0.69-0.71/ Piece US $ 125/ Piece
Min Order 10 Pieces 1000 Pieces 1000 Pieces 1000 Pieces 10 Pieces
Trade Terms - - - - FOB, CFR, CIF, EXW
Payment Terms T/T, Western Union, Paypal L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification CE, ISO, SGS ISO ISO ISO CE, ISO
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, HSE, ISO 14064, QC 080000, GMP, BSCI OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 ISO 9001, ISO 14001
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Application: Cunstruction Build; Industrial Magnet;
Surface Treatment: Yes;
Technics: Casting;
Material: Steel;
Type: Fasteners;
Product Name: Formwork Magnet Precast Concrete Magnet;
Transportation: by Sea, by Air, by Express;
Lead Time: 7-15 Days;
Application: Construction;
Surface Treatment: Yes;
Technics: Forged;
Material: Steel;
Type: Fasteners;
Size: 17mm;
Surface: Eg;
Note: OEM Service Is Available;
Name: Tie Nut;
Application: Construction;
Surface Treatment: Yes;
Technics: Forged;
Material: Steel;
Type: Fasteners;
Size: 17mm;
Surface: Eg;
Note: OEM Service Is Available;
Name: Anchor Nut;
Application: Construction;
Surface Treatment: Yes;
Technics: Forged;
Material: Steel;
Type: Fasteners;
Size: 17mm;
Surface: Eg;
Note: OEM Service Is Available;
Name: Anchor Nut;
After-sales Service: 24 Hours-7 Days-Available;
Warranty: 5 Years;
Application: Transportation;
Surface Treatment: No;
Technics: Pre-Molding;
Material: Neoprene;
Type: Road Expansion Joint;
Name: Rubber Bridge Expansion Joint;
Size: Customzied;
Hardness: 60+/-5 Shorea;
Package: Packed in Wovenbag on Pallet;
Lead Time: Within 15 Days for MOQ;
MOQ: 10PCS;
Drawing: Acceptable;
Tensile Strength: ≥15MPa;
Supplier Name

Great Magtech (Xiamen) Electric Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Hengshui Jingtong Rubber Co., Ltd.

China Supplier - Gold Member Audited Supplier