Flux Treatment
US$1,000.00-100,000.00 / Set
  • Recommend for you
  • What is Heavy-Duty Galvanized Elevators & Lifting Machinery for International Manufacturing
  • What is High Quality Factory Zink Pump
  • What is Fully Automatic Hot DIP Galvanizing Equipment for Pipe Coating Solutions

What is Flux Iron Remove Galvanizing Line Galvanizing Production Line Galvanizing Machine

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$1,000.00-100,000.00 / Set

Sepcifications

  • After-sales Service Whole Life
  • Warranty Whole Life
  • Type Coating Production Line
  • Coating Galvanized
  • Certification CE, ISO
  • Condition New
  • Transport Package as Required
  • Specification customized
  • Trademark Annuo
  • Origin Shijiazhuang, Hebei Province, China
  • Control Method PLC Centralized Control

Product Description

Product: Flux Treatment System Deatails: Features: - Easy to operate, running safe and raliable. - High treatment efficiency - Small size and light weight, simple structure - Easy maintainance Components: - PLC - Body - Filter presses - Peristaltic pump - ...

Learn More

Flux Treatment Comparison
Transaction Info
Price US $ 1,000.00-100,000.00/ Set US $ 100,000.00-3,000,000.00/ Piece US $ 150000/ Set US $ 100,000.00-3,000,000.00/ Piece US $ 100,000.00-3,000,000.00/ Piece
Min Order 1 Sets 1 Pieces 1 Set 1 Pieces 1 Pieces
Payment Terms L/C, T/T, D/P L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Western Union L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification CE, ISO CE, ISO CE, ISO CE, ISO CE, ISO
Management System Certification ISO 9001 ISO 9001, ISO 14001 ISO 9001 ISO 9001, ISO 14001 ISO 9001, ISO 14001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue US$10 Million - US$50 Million US$1 Million - US$2.5 Million US$5 Million - US$10 Million US$1 Million - US$2.5 Million US$1 Million - US$2.5 Million
Business Model Own Brand(annuo) OEM, ODM, Own Brand() OEM, Own Brand(CICEL) OEM, ODM, Own Brand() OEM, ODM, Own Brand()
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Off Season Lead Time: 3-6 months
Peak Season Lead Time: 3-6 months
Product Attributes
Specification
After-sales Service: Whole Life;
Warranty: Whole Life;
Type: Coating Production Line;
Coating: Galvanized;
Condition: New;
Control Method: PLC Centralized Control;
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
Type: Coating Production Line;
Coating: Vacuum Coating;
Substrate: Steel;
Condition: New;
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
Supplier Name

Hebei Annuo Automation Technology Co., Ltd.

Diamond Member Audited Supplier

Xuzhou RITMAN Equipment Co., Ltd.

Diamond Member Audited Supplier

Jiangsu Cicel Vacuum Technology Co., Ltd.

Gold Member Audited Supplier

Xuzhou RITMAN Equipment Co., Ltd.

Diamond Member Audited Supplier

Xuzhou RITMAN Equipment Co., Ltd.

Diamond Member Audited Supplier