Mobile Battery EV Charger
US$8,800.00 / Piece
View
  • Recommend for you
  • What is Ocpp DC Fast Charging Station Electric Vehicle Quick EV Charger Single/ Dual Guns
  • What is Smart Grid Charging 240kw 120kw 60kw Workplace Car Charging Stations New Condition CCS Dual-Port EV Charger Chademo CCS2 CCS1
  • What is Japanese Standard Ocpp 1.6j Chademo EV Charger 30kw 125A Charging Station

What is Customizable Emergency Power Built-in Battery Pack Mobile Battery EV Charger

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

2 Pieces US$8,800.00 / Piece

Sepcifications

  • Connector Type CCS1, CCS2, CHAdeMO, GB/T
  • Installation Floor Type
  • Location Public Use
  • Number of Charging Interfaces One Pile with Multiple Charges
  • Start Mode Credit Card Payment, Mobile Remote Operation, RFID Authentic
  • Transport Package Wooden Stake + Cardboard-Shell
  • Specification 700*450*1680
  • Trademark Future Digital Energy
  • Origin Shenzhen
  • Certification CE, ISO, RoHS
  • Standard CCS2 IEC 61851 IEC 62196
  • Cooling Air-Cooled
  • Type Fast EV Charging Station

Product Description

Product Description 120KWH Energy Storage emergency Charging station Mobile road Rescue charger station • Ten Safety Protection. • Support online data upgrade. • Perfect solution for roadside highway power-run-out electric vehicles. • Simple operation, convenient ...

Learn More

Mobile Battery EV Charger Comparison
Transaction Info
Price US $ 8800/ Piece US $ 3000/ Piece US $ 3000/ Piece US $ 3000/ Piece US $ 3000/ Piece
Min Order 2 Pieces 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Payment Terms L/C, T/T T/T, Paypal T/T, Paypal T/T, Paypal T/T, Paypal
Quality Control
Product Certification CE, ISO, RoHS - - - -
Management System Certification ISO 9001, ISO 14001 - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe - - - -
Annual Export Revenue US$2.5 Million - US$5 Million - - - -
Business Model OEM, ODM - - - -
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
- - - -
Product Attributes
Specification
Connector Type: CCS1, CCS2, CHAdeMO, GB/T;
Installation: Floor Type;
Location: Public Use;
Number of Charging Interfaces: One Pile with Multiple Charges;
Start Mode: Credit Card Payment, Mobile Remote Operation, RFID Authentic;
Standard: CCS2 IEC 61851 IEC 62196;
Cooling: Air-Cooled;
Type: Fast EV Charging Station;
Connector Type: CCS1, CCS2, GB/T;
Installation: Wall Mounted;
Location: Public Use;
Number of Charging Interfaces: One Pile with Multiple Charges;
Start Mode: Credit Card Payment;
Rate Power: Customization;
Efficiency: 95% and Above;
Charging Protocol: Ocpp1.6;
Color: White;
Connector Type: CCS1, CCS2, GB/T;
Installation: Wall Mounted;
Location: Public Use;
Number of Charging Interfaces: One Pile with Multiple Charges;
Start Mode: Credit Card Payment;
Rate Power: Customization;
Efficiency: 95% and Above;
Charging Protocol: Ocpp1.6;
Color: White;
Connector Type: CCS1, CCS2, GB/T;
Installation: Wall Mounted;
Location: Public Use;
Number of Charging Interfaces: One Pile with Multiple Charges;
Start Mode: Credit Card Payment;
Rate Power: Customization;
Efficiency: 95% and Above;
Charging Protocol: Ocpp1.6;
Color: White;
Connector Type: CCS1, CCS2, GB/T;
Installation: Wall Mounted;
Location: Public Use;
Number of Charging Interfaces: One Pile with Multiple Charges;
Start Mode: Credit Card Payment;
Rate Power: Customization;
Efficiency: 95% and Above;
Charging Protocol: Ocpp1.6;
Color: White;
Supplier Name

Future Digital Energy Co., Ltd.

Diamond Member Audited Supplier

Hebei Dongduo Electrical Technology Co., Ltd.

Diamond Member Audited Supplier

Hebei Dongduo Electrical Technology Co., Ltd.

Diamond Member Audited Supplier

Hebei Dongduo Electrical Technology Co., Ltd.

Diamond Member Audited Supplier

Hebei Dongduo Electrical Technology Co., Ltd.

Diamond Member Audited Supplier