Specification |
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, 1000;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Color Coated;
Alloy: Alloy;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Heat Sink, Decorations;
Technique: Extruded;
Grade: 5000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Product Name: Aluminium Coil;
Width: 1000-2000mm;
Thickness: 0.2-6mm;
Hardness: 33;
Coil Weight: 4--5ton;
Zinc Coating: 30-275G/M2;
Finish: Mill Finish;
Length: as Customer Request;
Thickness Tolerance: +/-0.1mm;
Width Tolerance: +/-2mm;
Test: ISO /SGS;
Payment: T/T, LC.D/P;
Production Time: 15-30 Work Days;
Shape: Coil;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Heat Sink, Decorations;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Product Name: Aluminium Coil;
Width: 600-1500mm;
Thickness: 0.12-0.5mm;
Hardness: H18;
Coil Weight: 4--5ton;
Zinc Coating: 30-275G/M2;
Finish: Mill Finish;
Length: as Customer Request;
Thickness Tolerance: +/-0.1mm;
Width Tolerance: +/-2mm;
Test: ISO /SGS;
Payment: T/T, LC.D/P;
Production Time: 15-30 Work Days;
Shape: Coil;
|
Color: Aluminum Primary Color;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Building and Thermal Insulation Works;
Technique: Casting and Rolling;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Non-alloy;
Weight Per Coil: 100kgs, 200kgs, 250kgs, 300kgs, 500kgs, 1000kgs;
MOQ: 3000kgs;
Surface: Mill Finish;
Production Time: 15~20 Days;
Port of Loading: Qingdao Port, China;
|
Color: Aluminum Primary Color;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Building and Thermal Insulation Works;
Technique: Cold Rolled, Hot Rolled;
Grade: 5000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Non-alloy;
Thickness: 0.2mm~1.2mm;
MOQ: 3000kgs;
Production Time: 7~15 Days;
Thickness Tolerance: +/-0.02mm;
Port of Loading: Qingdao Port, China;
|