Specification |
Type: Steel Plate, Stainless Steel Coils;
Standard: ASTM, AISI, GB, JIS, DIN, EN, ASTM, AISI, GB, JIS, DIN, BS;
Grade: 200 Series 300 Series 400 Series;
Shape: Coil Strip, Round;
Technique: Cold Rolled, Hot Rolled, Cold Rolled Hot Rolled;
Surface Treatment: Polished, 2b, 2D, Ba, No.1, 8K, Mirror;
Application: Mold & Dies, Ship Plate, Boiler Plate;
Special Use: Measuring Tools, Cutters in Common Steel;
Stock: Stock;
After-Sales Service: on Line, Online;
Warranty: 3 Years;
Edge: Slit Edge;
Delivery Time: Within 7 Working Days;
Supply Ability: 10000 Tons/Month;
Surface: Ba/2b/No.1/No.3/No.4/8K/Hl/2D/1d;
Minimum Order Quantity: 1 Ton;
Price Term: Fob CIF CFR DDP DDU DAP;
Processing Service: Welding, Punching, Cutting, Bending, Decoiling;
Coil Weight: 3-5 Tons/Coil or as Your Request;
Protection: PVC, PE Film White or Blue, Laser Film;
Sample: Sample Freely;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Welded;
Surface Treatment: Polished;
Material Grade: 201/201/3041/316L/347H/321/309S/310S/2205/2507/904;
Application: Steel/Building Material/Stainless Steel/Steel Pipe;
MOQ: 500kgs;
Delivery Time: 15-30 Working Days;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Welded;
Surface Treatment: Polished;
Material Grade: 201/201/3041/316L/347H/321/309S/310S/2205/2507/904;
Application: Steel/Building Material/Stainless Steel/Steel Pipe;
MOQ: 500kgs;
Delivery Time: 15-30 Working Days;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Welded;
Surface Treatment: Polished;
Material Grade: 201/201/3041/316L/347H/321/309S/310S/2205/2507/904;
Application: Steel/Building Material/Stainless Steel/Steel Pipe;
MOQ: 500kgs;
Delivery Time: 15-30 Working Days;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Welded;
Surface Treatment: Polished;
Material Grade: 201/201/3041/316L/347H/321/309S/310S/2205/2507/904;
Application: Steel/Building Material/Stainless Steel/Steel Pipe;
MOQ: 500kgs;
Delivery Time: 15-30 Working Days;
Finish: Mirror,Polished,No.4,2b,6K;
|