Scaffold
US$750.00-850.00 / Ton
View
  • Recommend for you
  • What is SGS Tested En74 Quality Standard Galvanized Scaffolding American Drop Forged Swivel Coupler From Huayou Scaffolding
  • How to Make Hot Sales Scaffolding Steel Prop for Tube Galvanized for Construction
  • What is Heavy Duty Painted/Glavanized Main Frame Mason Frame H Frame Ladder Steel Scaffolding Frame for South America Market

What is Metal Scaffolding Plank with Hook Platform Steel Board Metal Plank Catwalk Perforated Steel Plank Gi Plank Scaffolding Steel Plank

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$750.00-850.00 / Ton

Sepcifications

  • After-sales Service Remote or on-Site Technical Support
  • Warranty 6 Months
  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Building Scaffold
  • Transport Package by Pallet, Suitable for Sea Transport
  • Specification 210mm/240mm/250mm/225mm/230mm/300mm/320mm
  • Trademark HUAYOU
  • Origin China
  • Sruface Treatment Pre-Galvanized
  • Steel Grade Q195 / Q235
  • Color Silver
  • Certificate SGS/ISO
  • Width 0.5-4m
  • Thickness 0.8-2.0mm
  • Height 38mm/40mm/45mm/50mm/63mm/76mm
  • Support Flat / Square /Ladder Type
  • End Cap Cover / Insert
  • Application Building/Tunnel/Bridge Construction
  • Delivery Time 15-20days
  • MOQ 1 Piece
  • OEM Available

Product Description

Scaffolding Metal Plank is an important component to provide support for construction work. It helps workers to walk through and work on the different scaffolding system. With its various design and size, Huayou Scaffolding Metal Plank has became the nesseccory components to scaffolding systems and ...

Learn More

Scaffold Comparison
Transaction Info
Price US $ 750.00-850.00/ Ton US $ 3.5/ Piece US $ 3.5/ Piece US $ 3.5/ Piece US $ 3.5/ Piece
Min Order 1 Tons 500 Pieces 500 Pieces 500 Pieces 500 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Paypal L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification SGS/ISO - - - -
Management System Certification ISO 9001 ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: Remote or on-Site Technical Support;
Warranty: 6 Months;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Sruface Treatment: Pre-Galvanized;
Steel Grade: Q195 / Q235;
Color: Silver;
Width: 0.5-4m;
Thickness: 0.8-2.0mm;
Height: 38mm/40mm/45mm/50mm/63mm/76mm;
Support: Flat / Square /Ladder Type;
End Cap: Cover / Insert;
Application: Building/Tunnel/Bridge Construction;
Delivery Time: 15-20days;
MOQ: 1 Piece;
OEM: Available;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Supplier Name

Tianjin Huayou Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier