Specification |
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Cold Drawn;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Embossed;
Alloy: Alloy;
Thickness: 0.15-200mm;
Sample: Free;
Tolerance: 1%;
MOQ: 1 Ton;
Delivery Time: 7-15 Days;
Packing: Standard Seaworthy Packing;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Cold Drawn;
Grade: 1000 2000 3000 4000 5000 6000 7000 8000 Series;
Temper: O - H112;
Surface Treatment: Embossed;
Alloy: Alloy;
Length: 6m or 12m;
Delivery Time: 7-15 Days;
Payment Term: L/C T/T (30% Deposit);
Quality: Provide Mtc (Mill Test);
Model Number: Customized;
Thickness: 0.02-350;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting...;
Fabricator: Cutting, Millling, Punch, Stamping, Drill, CNC, as;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Cold Drawn;
Grade: 1000 2000 3000 4000 5000 6000 7000 8000 Series;
Temper: O - H112;
Surface Treatment: Embossed;
Alloy: Alloy;
Length: 6m or 12m;
Delivery Time: 7-15 Days;
Payment Term: L/C T/T (30% Deposit);
Quality: Provide Mtc (Mill Test);
Model Number: Customized;
Thickness: 0.02-350;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting...;
Fabricator: Cutting, Millling, Punch, Stamping, Drill, CNC, as;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Thickness: 0.2-500mm;
Width: 20-3000mm;
Length: <=12000mm;
Date of Shipment: 15-20 Days After The Deposit;
MOQ: 1 Ton;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Thickness: 0.2-500mm;
Width: 20-3000mm;
Length: <=12000mm;
Date of Shipment: 15-20 Days After The Deposit;
MOQ: 1 Ton;
|