Storz Couplings with Safety Latch Hose
US$1.00-2.00 / Piece
View
  • Recommend for you
  • What is Storz Connector on Fire Hydrant
  • What is American Standard Fire Hose Coupling
  • What is Storz Suction Female End Hose Coupling

What is 8 Inch Aluminum Storz Couplings with Safety Latch Hose Coupling

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

50 Pieces US$1.00-2.00 / Piece

Sepcifications

  • Surface Treatment Hard Anodized Coated
  • Material Aluminum
  • Transport Package Plastic Bag and Carton Then Pallet
  • Specification 6, 8, 10, 12inch
  • Trademark ICM
  • Origin China
  • Method Mold Forged
  • Temperature -50c to 80c
  • Bolts and Nuts Galvanized Steel 12.9 Grade
  • Lead Time Withinn 35-45 Days After Confiming The Normal Orde
  • Application Firefighting, Irrigation, Petroleum, Hydrocarbons

Product Description

We work on this product for more than 10 years and could supply one stop solution on the hose coupling and pipe fittings. We mainly supply these couplings to our customer. Such as Camlock coupling, Air hose coupling, Bauer coupling, fire fighting couplings ( Stroz coupling, Guillenmin couplings, ...

Learn More

Storz Couplings with Safety Latch Hose Comparison
Transaction Info
Price US $ 1.00-2.00/ Piece US $ 386.00-430.00/ Piece US $ 386.00-430.00/ Piece US $ 86.00-90.00/ Piece US $ 2.60-24.00/ Piece
Min Order 50 Pieces 10 Pieces 10 Pieces 1 Pieces 5 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Paypal L/C, T/T, D/P, Paypal L/C, T/T, D/P, Paypal L/C, T/T, D/P, Paypal
Quality Control
Product Certification - CCC, CE CCC, CE ISO9001:2015 ISO9000:2015
Management System Certification ISO 9001 - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe - - - -
Annual Export Revenue - - - - -
Business Model OEM - - - -
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
- - - -
Product Attributes
Specification
Surface Treatment: Hard Anodized Coated;
Material: Aluminum;
Method: Mold Forged;
Temperature: -50c to 80c;
Bolts and Nuts: Galvanized Steel 12.9 Grade;
Lead Time: Withinn 35-45 Days After Confiming The Normal Orde;
Application: Firefighting, Irrigation, Petroleum, Hydrocarbons;
Surface Treatment: Epoxy Painting, Anodic Oxidation;
Material: Aluminum Alloy;
Color: Red/Bule /Orange;
Functions: Bind with Hose;
Applications: Fire Fight Emergency;
Key Word: Hose Coupling;
Usage: Fire Sprinkler System;
Head Code: Square;
Connection: Grooved Couplings;
Surface Treatment: Epoxy Painting, Anodic Oxidation;
Material: Aluminum Alloy;
Color: Red/Bule /Orange;
Functions: Bind with Hose;
Applications: Fire Fight Emergency;
Key Word: Hose Coupling;
Usage: Fire Sprinkler System;
Head Code: Square;
Connection: Grooved Couplings;
Surface Treatment: Epoxy Painting, Anodic Oxidation;
Material: Aluminum Alloy;
Color: Red/Bule /Orange;
Functions: Bind with Hose;
Applications: Fire Fight Emergency;
Key Word: Hose Coupling;
Usage: Fire Sprinkler System;
Head Code: Square;
Connection: Grooved Couplings;
Surface Treatment: Anodic Oxidation;
Material: Aluminum;
Application: Fire Hose Couplings/Fire Fighting Emergency Rescue;
Item: Storz Couplings;
Applicable Media: Water/Foam;
Usage: Fire Safety;
Color: Silver or Brass;
Supplier Name

JINAN ICM INDUSTRIES VALVES & FITTINGS CO., LTD

China Supplier - Gold Member Audited Supplier

Xinghua Yongxing Fire Fighting Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xinghua Yongxing Fire Fighting Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xinghua Yongxing Fire Fighting Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Xinghua Yongxing Fire Fighting Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier