Specification |
After-sales Service: Technical Support;
Warranty: One Year;
Material: Aluminum;
Connection: Male;
Working Pressure: 150psi;
Thread: NPT/Bsp/BSPP;
Type: Couplings a B C D E F DC Dp;
Working Temperature: -20~232;
|
Material: PE100 or PE80;
Connection: Injection Molding;
Name: High Pressure Plastic Pipe End Cap Accessories;
Connection Type: Butt Fusion;
Application: Gas, Water, Oil etc.;
Executive Standard: En 12201-3:2003, En 1555-3:2002+A1:2005;
Norminal Pressure: Pn4, Pn6, Pn8, Pn10, Pn12.5 Pn16, Pn20;
SDR: SDR33, SDR26, SDR21, SDR17, SDR13.6, SDR11, SDR9;
Production Equipment: 125sets;
Life Span: 50 Years;
Warranty Period: 1 Year;
|
Material: PE100 or PE80;
Connection: Injection Molding;
Name: High Pressure Plastic Pipe End Cap Accessories;
Connection Type: Butt Fusion;
Application: Gas, Water, Oil etc.;
Executive Standard: En 12201-3:2003, En 1555-3:2002+A1:2005;
Norminal Pressure: Pn4, Pn6, Pn8, Pn10, Pn12.5 Pn16, Pn20;
SDR: SDR33, SDR26, SDR21, SDR17, SDR13.6, SDR11, SDR9;
Production Equipment: 125sets;
Life Span: 50 Years;
Warranty Period: 1 Year;
|
Material: PE100 or PE80;
Connection: Injection Molding;
Name: High Pressure Plastic Pipe End Cap Accessories;
Connection Type: Butt Fusion;
Application: Gas, Water, Oil etc.;
Executive Standard: En 12201-3:2003, En 1555-3:2002+A1:2005;
Material supplier: Sinopec, Basell, Borouge etc;
Norminal Pressure: Pn4, Pn6, Pn8, Pn10, Pn12.5 Pn16, Pn20;
SDR: SDR33, SDR26, SDR21, SDR17, SDR13.6, SDR11, SDR9;
Production Equipment: 125sets;
Life Span: 50 Years;
Warranty Period: 1 Year;
|
Material: PE100 or PE80;
Connection: Injection Molding;
Name: High Pressure Plastic Pipe End Cap Accessories;
Connection Type: Butt Fusion;
Application: Gas, Water, Oil etc.;
Executive Standard: En 12201-3:2003, En 1555-3:2002+A1:2005;
Norminal Pressure: Pn4, Pn6, Pn8, Pn10, Pn12.5 Pn16, Pn20;
SDR: SDR33, SDR26, SDR21, SDR17, SDR13.6, SDR11, SDR9;
Production Equipment: 125sets;
Life Span: 50 Years;
Warranty Period: 1 Year;
|