UR Rhh
Negotiable
  • Recommend for you
  • What is 3 Phase 3 Wires Energy Metering Joint Junction Box
  • What is Gpw201, Gpw301 Watt Transducer
  • What is Gpf Epf Frequency Transducer (GPF EPF)

What is Ge Power Module, Model: UR Rhh

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece Negotiable

Sepcifications

  • Trademark GE
  • Origin China

Product Description

MODEL:UR SHA,UR RHH POWER RATING:88-250V=r @ 0.75A [email protected] GE UR relay module List Order Type Brief introduction 1 UR RHH Power supply module power module 2 UR 9EH G60 CPU module When ordering, please specify the model of the CPU used: ...

Learn More

UR Rhh Comparison
Transaction Info
Price Negotiable US $ 10.00-20.00/ Meter US $ 10.00-20.00/ Meter US $ 10.00-20.00/ Meter US $ 10.00-20.00/ Meter
Min Order 1 Pieces 4 Meters 4 Meters 4 Meters 4 Meters
Payment Terms L/C, T/T, D/P, Western Union, Alipay L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Management System Certification ISO 9001, ANSI/ESD ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Southeast Asia, Africa, Mid East, Eastern Asia South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - US$10 Million - US$50 Million US$10 Million - US$50 Million US$10 Million - US$50 Million US$10 Million - US$50 Million
Business Model Own Brand() OEM, Own Brand(NANTE) OEM, Own Brand(NANTE) OEM, Own Brand(NANTE) OEM, Own Brand(NANTE)
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Product Attributes
Specification
Model Number: Hfp52;
Current: 35-120A;
Poles: 3-4 Poles;
Conductor Material: Copper;
Model Number: Hfp52;
Current: 35-120A;
Poles: 3-4 Poles;
Conductor Material: Copper;
Model Number: Hfp52;
Current: 35-120A;
Poles: 3-4 Poles;
Conductor Material: Copper;
Model Number: Hfp52;
Current: 35-120A;
Poles: 3-4 Poles;
Conductor Material: Copper;
Supplier Name

Haiyan Jinhan Import-Export Co., Ltd.

Diamond Member Audited Supplier

Shaoxing Nante Crane Equipment Co., Ltd.

Diamond Member Audited Supplier

Shaoxing Nante Crane Equipment Co., Ltd.

Diamond Member Audited Supplier

Shaoxing Nante Crane Equipment Co., Ltd.

Diamond Member Audited Supplier

Shaoxing Nante Crane Equipment Co., Ltd.

Diamond Member Audited Supplier