Forged
US$1.00 / Piece
View

Stainless Steel High Pressure Sw Socket Welding Union for Petroleum Chemical Video

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

20 Pieces US$1.00 / Piece

Sepcifications

  • Warranty 1 Year
  • Standard MSS SP-83
  • Technique Forged
  • Type Socket Union
  • Material Stainless Steel
  • Connection Welding
  • Transport Package Carton, Wooden Case
  • Specification 1/8"-3"
  • Origin Yan Cheng, China
  • Pressure 3000lb, 6000lb
  • Certificate Mss Sp-83-2014
  • Lead Time 25 to 35 Days
  • Delivery by Sea, by Air and by Express

Product Description

Product Description Product socket welding union forged pipe fittings Material F304L,F316L Contact type Socket welding Dimension Specification MSS SP-83-2014 Pressure 3000lb, 6000lb Temperature -20°C to +600°C Place of origin Yancheng, China Package Wooden case with cartons ...

Learn More

Forged Comparison
Transaction Info
Price US $ 1/ Piece US $ 0.17-7.20/ Piece US $ 0.40-17.60/ Piece US $ 0.089-0.10/ Piece US $ 0.17-7.20/ Piece
Min Order 20 Pieces 10000 Pieces 500 Pieces 1000 Pieces 10000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T, Western Union L/C, T/T, Western Union, Paypal L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification Mss Sp-83-2014 - - - ISO 90001
Management System Certification - ISO 9001, HQE ISO 9001, HQE ISO 9001, HQE ISO 9001, HQE
Trade Capacity
Export Markets East Asia(Japan/ South Korea), Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Warranty: 1 Year;
Standard: MSS SP-83;
Technique: Forged;
Type: Socket Union;
Material: Stainless Steel;
Connection: Welding;
Pressure: 3000lb, 6000lb;
Lead Time: 25 to 35 Days;
Delivery: by Sea, by Air and by Express;
Standard: BS Eniso1452;
Technique: Injected;
Nominal Diameter: Dn15~Dn100;
Type: Socket Union;
Material: UPVC;
Connection: Glue Socket;
Color: Grey;
Standard: BS Eniso1452;
Technique: Injected;
Nominal Diameter: Dn15~Dn100;
Type: Socket Union;
Material: PVC-U;
Connection: Socket;
Standard: DIN8077-8078;
Technique: Injected;
Nominal Diameter: 20-110mm;
Type: Socket Union;
Material: PP-R;
Connection: Welding;
Color Default: Green;
Standard: BS Eniso1452;
Technique: Injected;
Nominal Diameter: 20mm~110mm;
Type: Socket Union;
Material: UPVC;
Connection: Glue Socket;
Color: Black,Grey,Blue;
Pressure: Pn10;
Usage: Water Supply;
Delivery Time: 20-45 Days After Deposit;
Supplier Name

Yancheng Jicheng Machinery Co., Ltd

China Supplier - Gold Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier

CHANGZHOU XITA PLASTIC CO., LTD.

China Supplier - Diamond Member Audited Supplier