Bailey Bridge
US$600.00-800.00 / Ton
  • Recommend for you
  • What is HD-200 Galvanized Bailey Bridge with 3% Tolerance and on-Site Service
  • What is Steel Bailey Bridge with Galvanizing Treatment for Safe Foot Traffic
  • What is Reliable Prefabricated Bailey Bridge: Galvanized for Long-Lasting Use

What is Customizable Maintenance, Demolition Container China Prefabricated Metal Steel Structure Bailey Bridge OEM

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$600.00-800.00 / Ton

Sepcifications

  • After-sales Service Maintenance, Demolition
  • Scale Customizable
  • Usage Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct
  • Transport Package Container
  • Specification Customizable
  • Trademark Customizable
  • Origin China

Product Description

Company Profile JiangSu SuJian Road &Bridge Machine Co., Ltd was established in 2011 and located in ZhenJiang city, JiangSu province. The transportation of sea, railway and air are all extremely developed. The company currently has over 200 employees and an annual output value over 300 millions. ...

Learn More

Bailey Bridge Comparison
Transaction Info
Price US $ 600.00-800.00/ Ton US $ 650.00-800.00/ Ton US $ 720.00-800.00/ Ton US $ 720.00-800.00/ Ton US $ 2.80-9.80/ Square Meter
Min Order 1 Tons 20 Tons 20 Tons 20 Tons 1 Square Meters
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T
Quality Control
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, ISO 14064, GMP ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001
Trade Capacity
Export Markets - North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue US$50 Million - US$100 Million Above US$100 Million Above US$100 Million Above US$100 Million Above US$100 Million
Business Model - OEM, ODM, Own Brand(Dingrui Yongcheng) OEM, ODM, Own Brand(Dingrui Yongcheng) OEM, ODM, Own Brand(Dingrui Yongcheng) OEM, ODM, Own Brand(Kexinda)
Average Lead Time - Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Product Attributes
Specification
After-sales Service: Maintenance, Demolition;
Scale: Customizable;
Usage: Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct;
After-sales Service: Full-Service, Free Expert Consultation, Guarantee;
Scale: Large Bridge;
Usage: Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct;
Grade: Q235 Q355b;
Application: Steel Structure Bridge;
Processing Service: Bending, Welding, Decoiling;
Material: Steel;
Secondary Frame: Tie Bar, Bracing, Diagonal Rod for Bridge;
Pre-Assembly: Pre-Asembly in Our Factory;
Main Frame: H Beam and Column, Lower Chord Brace;
Surface Treatment: Painted;
Lead Time: 45-60 Days;
Tolerance: ±1%;
Delivery Time: Customized;
After-sales Service: Guide Installation or Install on Site;
Scale: Large Bridge;
Usage: Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct;
Delivery Time: 15-45 Days;
Size/Dimensions: (Scale) Large;
Across Way: Diffuse Water Bridge;
Stress Characteristics: Beam Bridge;
Lane Position: Half Through Bridge;
After-sales Service: Guide Installation or Install on Site;
Scale: Large Bridge;
Usage: Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct;
Delivery Time: 15-45 Days;
Size/Dimensions: (Scale) Large;
Across Way: Diffuse Water Bridge;
Stress Characteristics: Beam Bridge;
Lane Position: Half Through Bridge;
After-sales Service: We Supply After Sale Service;
Scale: Large Bridge;
Usage: Constructure Project;
Thickness: 0.3-0.8;
Logo: Kexinda;
Supplier Name

Jiangsu Sujian Road & Bridge Machine Co., Ltd.

Diamond Member Audited Supplier

Dingrui Yongcheng Construction Engineering Co., Ltd

Diamond Member Audited Supplier

Dingrui Yongcheng Construction Engineering Co., Ltd

Diamond Member Audited Supplier

Dingrui Yongcheng Construction Engineering Co., Ltd

Diamond Member Audited Supplier

Kexinda(Tianjin)Industrial Co., Ltd

Diamond Member Audited Supplier