Cuplock System Inside Intermediate Transom for Building Material

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$10.00-20.00 / Piece

Sepcifications

  • Material Steel
  • Type Mobile
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Double Scaffolding
  • Erection Position External Scaffolding
  • Move Method Horizontal mobile Scaffolding
  • Scaffolding Part Type Intermediate Transom
  • Construction Properties Building Scaffold
  • Transport Package Steel Pallet
  • Specification ANSI 10.8/ISO90012008/BS1139
  • Trademark LARS
  • Origin China

Product Description

Acts as an intermediate transom but extends beyond the inside ledger to Provide intermediate support for one or two inside boards. Drops into place over the ledgers and is secured with a locking device to prevent movement Length (m) Weight (kg) 1.62 (1 board) ...

Learn More

Scaffollding Comparison
Transaction Info
Price US $ 10.00-20.00/ Piece US $ 12.00-19.00/ Piece US $ 12.00-19.00/ Piece US $ 12.00-19.00/ Piece US $ 12.00-19.00/ Piece
Min Order 1 Pieces 1000 Pieces 1000 Pieces 1000 Pieces 1000 Pieces
Payment Terms L/C, T/T, D/P, Western Union L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Management System Certification ISO 9001, ISO 9000 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe - - - -
Annual Export Revenue US$10 Million - US$50 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million
Business Model OEM OEM, Own Brand() OEM, Own Brand() OEM, Own Brand() OEM, Own Brand()
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: one month
Product Attributes
Specification
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Intermediate Transom;
Construction Properties: Building Scaffold;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Size: 68mm, 40mm;
Supplier Name

Laian Golden Resource Metalwork Co., Ltd

Diamond Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

Gold Member Audited Supplier