Specification |
Warranty: 1 Year Warrantly;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Application: Household Appliances, Furniture, Home Use;
Runner: Cold Runner;
Design Software: UG;
Standard: Lkm.Hasco.Dme;
Customized: Customized;
Name: Top Selling Plastic Plate Mould with Leaf Shape Mo;
Cavity: 1 Cavity;
Design: 3D or 2D;
Runner Type: Hot Runner;
Mould Steel: P20h/718/2738etc;
Mould Base: Lkm.Hasco.Dme;
Mould Life: 500.000~1million Shots;
Sample Time: 50 Days;
Style: Single Deck,Double Deck;
Color: Manycolors Are Avaliables;
|
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
Product Name: Plastic Flower Pot Molds;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting,etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
After-sales Service: 24hrs Online Service;
Product Name: Plastic Storage Box Moulds;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
Product Name: Plastic Storage Box Tooling;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting,etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: PUNCH;
Customized: Customized;
Product Name: Plastic Crate Toolings;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting,etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|