Specification |
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Pressure Casting;
Application: Hardware;
Material: Steel;
Heat Treatment: Tempering;
Surface Treatment: Passivation;
Forging Tolerance: +/-0.2mm;
Standard: GB;
Warranty Period: One Year;
Price Term: EXW,Fob,CIF,DDP;
Size: Dia.100mm, Length 6000mm;
Weight: 10kg~10ton;
Shape: Ring, Shaft, Round Bar, Block, Sleeve, Wheel;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Gravity Casting;
Application: Hardware;
Material: Iron;
Heat Treatment: Tempering;
Surface Treatment: Hot Galvanized;
Forging Tolerance: +/-0.5mm;
Standard: ASTM;
OEM: Per Drawing/Sample;
Onsite Engineer: Available;
OEM Process: Mold-Sampling-Sampling Approval-Mass Production;
Keywords: Steel Forging, Metal Steel Forging, Aluminum Forgi;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Mold Forging;
Application: Machinery Parts;
Material: Aluminum Alloy, ADC10, ADC12, A380, A356, Alsi10mn;
Heat Treatment: Quenching;
Surface Treatment: Sand Blasting;
Forging Tolerance: +/-0.5mm;
Standard: ASTM;
Lead Time: 35 - 50days, Depends on The Parts;
Transport Packaging: Multiplayer Wood Box/Pallet;
Our Advantages: Factory Outlet;
Item: OEM Hot/Cold/Die/Drop Forging Parts;
Shipping Method: by Sea or by Air;
Quality Control: 100% QC Inspection;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Mold Forging;
Application: Machinery Parts;
Material: Aluminum Alloy, ADC10, ADC12, A380, A356, Alsi10mn;
Heat Treatment: Quenching;
Surface Treatment: Sand Blasting;
Forging Tolerance: +/-0.5mm;
Standard: ASTM;
Lead Time: 35 - 50days, Depends on The Parts;
Transport Packaging: Multiplayer Wood Box/Pallet;
Our Advantages: Factory Outlet;
Item: OEM Hot/Cold/Die/Drop Forging Parts;
Shipping Method: by Sea or by Air;
Quality Control: 100% QC Inspection;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Mold Forging;
Application: Machinery Parts;
Material: Aluminum/Steel/Brass/Stainless Steel;
Heat Treatment: Quenching, Annealing, Tempering, Normallizing;
Surface Treatment: Sand Blasting, Passivation, Qxidation, Polishing;
Forging Tolerance: +/-0.5mm;
Standard: ASTM;
Lead Time: 35 - 50days, Depends on The Parts;
Transport Packaging: Multiplayer Wood Box/Pallet;
Our Advantages: Factory Outlet;
Item: OEM Hot/Cold/Die/Drop Forging Parts;
Shipping Method: by Sea or by Air;
Quality Control: 100% QC Inspection;
|