UL FM Transition Coupling Ductile Iron for HDPE Style 997 995 Groove Fitting

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$0.50-10.00 / Piece

Sepcifications

  • Certification CE, FM
  • Surface Treatment Red,Yellow,Blue Painting etc.
  • Material Iron Steel
  • Transport Package in Sea Worthy Export Packing
  • Specification 1"-16"
  • Trademark Kingmetal
  • Origin China
  • Delivery Detail 15-30 Days After Down Payment
  • Technique Casting
  • Price Term Fob,CIF,CNF
  • Payment L/C,T/T
  • Secondary or Not Non Secondary
  • Standard or Not Standard
  • Alloy or Not Non Alloy
  • Pressure 300psi, 500psi, 750psi, 1000psi.
  • Range Coupling,Elbow,Tee,Reducer,Flange,etc
  • MOQ as Requested

Product Description

Transition Coupling FM/UL Ductile Iron for HDPE pipe style 997 995 Standard: ASME, ANSI, DIN, JIS, ASTM, UNI, BS, etc. Pressure: 300PSI, 500PSI, 750PSI, 1000PSI. Surface treatment: Red painted, orange painted, galvanized, red spraied, orange spraied, dacromet, epoxy powder, epoxy, ...

Learn More

HDPE Coupling Comparison
Transaction Info
Price US $ 0.50-10.00/ Piece US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece US $ 0.50-50.00/ Piece
Min Order 10 Pieces 100 Pieces 5 Pieces 10 Pieces 1 Pieces
Trade Terms - FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW FOB, CFR, CIF, CIP, CPT, FCA, EXW
Payment Terms L/C, T/T, Western Union L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification null, CE, FM null, CE null, CE null, CE null, CE
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Surface Treatment: Red,Yellow,Blue Painting etc.;
Material: Iron Steel;
Delivery Detail: 15-30 Days After Down Payment;
Technique: Casting;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
Secondary or Not: Non Secondary;
Standard or Not: Standard;
Alloy or Not: Non Alloy;
Pressure: 300psi, 500psi, 750psi, 1000psi.;
Range: Coupling,Elbow,Tee,Reducer,Flange,etc;
MOQ: as Requested;
Surface Treatment: Red,Blue Painting,etc;
Material: Iron;
Delivery Time: 15-30 Days After Dowm Payment;
Pressure: 300psi;
Techinic: Casting;
Gasket: EPDM;
Alloy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Brand: Kingmetal;
Payment: L/C,T/T;
Price Term: Fob,CIF,CNF;
Size: 1"-12";
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Range: Elbow,Reducer,Coupling,Flange,Tee,Reducer,Cross...;
Surface: Yellow,Red,Blue,etc;
Standard or Not: Standard;
Alloy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
MOQ: as Requested;
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Pressure: 300psi;
Techinic: Casting;
Gasket: EPDM;
Finish: Paint, Epoxy or Galvanization;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Payment: L/C,T/T;
Price Term: Fob,CIF,CNF;
MOQ: as Requested;
Surface Treatment: Red,Blue Painting,etc;
Material: Iron Steel;
Delivery Time: 15-30 Days After Dowm Payment;
Range: Elbow,Coupling,Tee,Reducer,Cap,Cross,etc;
Surface: Yellow,Red,Blue Painting,etc.;
Standard or Not: Standard;
Alloy or Not: Not Alloy;
Secondary or Not: Non Secondary;
Price Term: Fob,CIF,CNF;
Paymentq: L/C,T/T;
MOQ: as Requested;
Pressure: 300psi;
Supplier Name

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier