B366 N10276 Pipe Flanges Hastelloy C276 Loose Flange

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$15.00-30.00 / Piece

Sepcifications

  • Standard DIN, GB, JIS, GOST
  • Type Welding Flange
  • Material Alloy Steel
  • Structure Flanges
  • Connection Screws
  • Sealing Surface RF
  • Manufacturing Way Forging
  • Transport Package Bundles with Steel Strips and Wooden Frame
  • Specification 1/2"-48"
  • Trademark KINGMETAL
  • Origin China
  • Size 1/2"-48"
  • Name Steam Boiler Pipe
  • Product Material 15NiCuMoNb5/Wb36/1.6368
  • Keyword Alloy C276, Hastelloy C-276

Product Description

DN15-1200 3000lbs Forged Alloy C276 Forged Flange, UNS N10276 SORF Flange Manufacturer ,,, Hastelloy C276 Flanges are made up of the nickel chromium molybdenum alloy that is called hastelloy. The composition includes 50.99% nickel, 14.5% chromium, 15% molybdenum and carbon, manganese, silicon, ...

Learn More

Hastelloy C276 Loose Flange Comparison
Transaction Info
Price US $ 15.00-30.00/ Piece US $ 0.25-50.00/ Piece US $ 0.25-50.00/ Piece US $ 10/ Piece US $ 0.50-50.00/ Piece
Min Order 10 Pieces 1 Pieces 1 Pieces 10 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification - ISO - - ISO
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Standard: DIN, GB, JIS, GOST;
Type: Welding Flange;
Material: Alloy Steel;
Structure: Flanges;
Connection: Screws;
Sealing Surface: RF;
Manufacturing Way: Forging;
Size: 1/2"-48";
Name: Steam Boiler Pipe;
Product Material: 15NiCuMoNb5/Wb36/1.6368;
Keyword: Alloy C276, Hastelloy C-276;
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Blind Flange;
Material: Carbon Steel;
Structure: Flanges;
Connection: Welding;
Sealing Surface: RF;
Manufacturing Way: Forging;
Types: Wn, So, Bl, Pl, etc.;
Delivery Detail: 15-30 Days After Down Payment;
Alloy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Standard or Not: Standard;
Price Term: Fob, CIF, CNF;
Payment Term: L/C, T/T;
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Welding Flange;
Material: Carbon Steel;
Structure: Flanges;
Connection: Welding;
Sealing Surface: RF;
Manufacturing Way: Forging;
Certifications: ISO,TUV,Ad;
Types: Welding Neck,Blind,etc.;
Delivery Detail: 15-30 Days After Down Payment;
Alloy or Not: Non Alloy;
Secondary or Not: Non Secondary;
Standard or Not: Standard;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
Wall Thickness: Sch10 ~Sch Xxs;
Standard: ANSI, DIN, GB, JIS, GOST;
Type: Welding Flange;
Material: Carbon Steel;
Structure: Flanges;
Connection: Screws;
Sealing Surface: RF;
Manufacturing Way: Forging;
Surface: Black,Yellow,in Oil or Required;
Pressure: Pn6~Pn100;
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Welding Flange;
Material: Alloy Steel;
Structure: Flanges;
Connection: Welding;
Sealing Surface: RF;
Manufacturing Way: Forging;
Delivery Detail: 15-30 Days After Down Payment;
Standard or Not: Standard;
Alloy or Not: Alloy;
Secondarly or Not: Non Secondarly;
Flange Type: Wn,Bl,Pl,Sw,So,etc.;
Payment: L/C,T/T;
Price Term: Fob,CIF,CNF;
MOQ: as Requested;
Supplier Name

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier