Square Tube
US$450.00-1,500.00 / Ton
View
  • Recommend for you
  • What is High Quality PTFE Lined Carbon Pipe with Flange Connection
  • What is DIN1.5217 Uns K03013 20mnv6 Hot Finished Carbon Hollow Bar
  • What is Enameled Seamless Steel Tube SA192 for Air Preheater

What is Welded Q195 Carbon Steel Square Tube 25X25mm

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$450.00-1,500.00 / Ton

Sepcifications

  • Type Welded
  • Technique ERW
  • Material Carbon Steel
  • Surface Treatment Black
  • Usage Machinery Industry, Chemical Industry, Construction & Decoration
  • Section Shape Square
  • Transport Package in Bundle or as Per Customer′s Request.
  • Specification 10*10-900*900
  • Trademark Kingmetal
  • Origin China (Mainland)
  • Thickness 1.0mm-25mm(Welded); 2mm-30mm(Seamless)
  • Delivery Time 15-30 Days After Down Payments
  • Length 1-12m
  • Secondary or Not Non-Secondary
  • Alloy or Not Non-Alloy
  • Standard or Not Standard
  • Payment L/C, T/T
  • Price Term Fob, CIF, CNF
  • MOQ as Requested

Product Description

Standard: AISI, ASTM, DIN, EN, GB and JIS ASTM A213,ASTM A312,ASTM A269,ASTM A778,ASTM A790,A500,A554 DIN 17456,DIN 17458 JIS G3459,JIS G3463 etc Material: 300series:301,302,303,304,304L,309,309s,310,310S,316,316L,316Ti,317L,321,347 200series:201,202,202cu,204 ...

Learn More

Square Tube Comparison
Transaction Info
Price US $ 450.00-1,500.00/ Ton US $ 600.00-2,300.00/ Ton US $ 650.00-1,500.00/ Ton US $ 650.00-1,500.00/ Ton US $ 650.00-1,500.00/ Ton
Min Order 1 Tons 1 Tons 1 Tons 1 Tons 1 Tons
Trade Terms FOB, CFR, CIF, CIP, CPT, FCA, EXW - - - -
Payment Terms L/C, T/T, Western Union L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME ISO 9001, ISO 9000, ISO 14001, ISO 14000, ASME
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Type: Welded;
Technique: ERW;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Machinery Industry, Chemical Industry, Construction & Decoration;
Section Shape: Square;
Thickness: 1.0mm-25mm(Welded); 2mm-30mm(Seamless);
Delivery Time: 15-30 Days After Down Payments;
Length: 1-12m;
Secondary or Not: Non-Secondary;
Alloy or Not: Non-Alloy;
Standard or Not: Standard;
Payment: L/C, T/T;
Price Term: Fob, CIF, CNF;
MOQ: as Requested;
Type: Seamless;
Technique: Cold Rolled;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe;
Section Shape: Round;
Thickness: 1.2 - 9.5mm;
Length: 1-12m;
Delivery Time: 15-30 Days After Down Payment;
Standard or Not: Standard;
Alloy or Not: Is Alloy;
Secondary or Not: Non-Secondary;
Price Term: Fob,CIF,CNF;
Payment: L/C,T/T;
MOQ: as Requested;
Type: Seamless;
Technique: Cold Drawn;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling;
Section Shape: Round;
Length: 1-12m;
Thickness: 1.2-9.5mm;
Delivery Time: 15-30 Days After Down Payment;
Process: Cold Draw, Cold Rolled, etc.;
Alloy or Not: Non Alloy;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
Od: 1/2" to 24";
Type: Seamless;
Technique: Cold Drawn;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling;
Section Shape: Round;
Length: 1-12m;
Thickness: 1.2-9.5mm;
Delivery Time: 15-30 Days After Down Payment;
Process: Cold Draw, Cold Rolled, etc.;
Alloy or Not: Non Alloy;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
Od: 1/2" to 24";
Type: Seamless;
Technique: Cold Drawn;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling;
Section Shape: Round;
Length: 1-12m;
Thickness: 1.2-9.5mm;
Delivery Time: 15-30 Days After Down Payment;
Process: Cold Draw, Cold Rolled, etc.;
Alloy or Not: Non Alloy;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
Od: 1/2" to 24";
Supplier Name

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kingmetal Steel Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier