Power Transformer Tan Delta Capacitance and Dissipation Factor Testing Equipment

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$500.00 - 2,500.00 / Piece

Sepcifications

  • Transport Package Wooden Box with Foam Inside
  • Specification Can be customzied
  • Trademark United Electrical
  • Origin Wuhanchina
  • Orgin Hubei China
  • Input Power 220V±10% 50Hz/60Hz±10%
  • Temperature -10-40ºC
  • Humidity ≦80%Rh

Product Description

1.Overview CYGS-206C Automatic dielectric loss tester is the high accuracy measuring instrument for power station,transformer substation etc.field or laboratory to test the high voltage electric power equipment dielectric tangent value and capacitance.it is integrated structure,there are dielectric ...

Learn More

Dielectric Loss Tester Comparison
Transaction Info
Price US$500.00 - 2,500.00 / Piece US$1,900.00 / Piece US$4,500.00 - 5,100.00 / PC US$1,900.00 / Piece US$4,500.00 - 5,100.00 / PC
Min Order 1 Piece 3 Pieces 1 PC 3 Pieces 1 PC
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment LC, T/T, PayPal, Western Union LC, T/T, PayPal, Western Union, Small-amount payment LC, T/T, PayPal, Western Union LC, T/T, PayPal, Western Union, Small-amount payment
Quality Control
Management System Certification - - - - -
Trade Capacity
Export Markets North America, Europe, Domestic South America, Europe, Southeast Asia/ Mideast North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe South America, Europe, Southeast Asia/ Mideast North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - 170,815.44 RMB - 170,815.44 RMB -
Business Model Own Brand, ODM, OEM - - - -
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Orgin: Hubei China;
Input Power: 220V±10% 50Hz/60Hz±10%;
Temperature: -10-40ºC;
Humidity: ≦80%Rh;
After-sales Service: Technical Support and Services;
Warranty: 24 Months;
Max Diameter of Workpiece: Pneumatic Hydraulic;
Mass Scope of Workpiece: Pneumatic Hydraulic;
Type: Compression Testing Machine;
Maxcapacity: Pneumatic Hydraulic;
Accuracy Grade: Control Grade 0.1;
Loading Method: Pneumatic Hydraulic;
Display: Pointer Pressure Gauge;
Control: Drive Air Regulator;
Weight: 45kg;
After-sales Service: on Line;
Warranty: 12 Months;
Test Range: 0-10 Kpa(Standard);
Test Accuracy: 0.5%Fs;
Gas Supply: Less Than or Equal to 0.7MPa;
Power Supply: AC 220V 50Hz;
Gas Connection: Φ8 mm Polyurethane Tubes;
After-sales Service: Technical Support and Services;
Warranty: 24 Months;
Max Diameter of Workpiece: Pneumatic Hydraulic;
Mass Scope of Workpiece: Pneumatic Hydraulic;
Type: Compression Testing Machine;
Maxcapacity: Pneumatic Hydraulic;
Accuracy Grade: Control Grade 0.1;
Loading Method: Pneumatic Hydraulic;
Display: Pointer Pressure Gauge;
Control: Drive Air Regulator;
Weight: 45kg;
After-sales Service: on Line;
Warranty: 12 Months;
Test Range: 0-10 Kpa(Standard);
Test Accuracy: 0.5%Fs;
Gas Supply: Less Than or Equal to 0.7MPa;
Power Supply: AC 220V 50Hz;
Gas Connection: Φ8 mm Polyurethane Tubes;
Supplier Name

Kiyu Power Wuhan Co., Ltd

Diamond Member Audited Supplier

SHANDONG TEREK MANUFACTURE & TRADING CO., LTD.

Diamond Member Audited Supplier

Pubtester Instruments Co., Ltd.

Gold Member Audited Supplier

SHANDONG TEREK MANUFACTURE & TRADING CO., LTD.

Diamond Member Audited Supplier

Pubtester Instruments Co., Ltd.

Gold Member Audited Supplier