Electric Lifting Scaffolding
US$650.00-700.00 / Set
View
  • Recommend for you
  • What is Portable Mobile Folding Scaffolding Lift Scaffold Electric Scaffolding for Construction Building
  • What is Electric Remote Control Hydraulic Vertical Aerial Work Scissor Lift Platform Tables Cargo
  • What is 300kg Electric Hydraulic Lift Scaffolding Freight Goods for Sale Electric Scaffolding Lift Platform 8m Lifting Scaffold 12m

What is Warehouse Freight Electric Lifting Scaffolding 5m Portable Electric Scaffolding Lift Platform Scaffold Lift Electric

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-2 Sets US$700.00

3+ Sets US$650.00

Sepcifications

  • After-sales Service 1 Year
  • Warranty 1 Year
  • Material Steel
  • Type Mobile
  • Structural Style Multi-Pole Scaffolding
  • Framework Frame Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form High Formwork
  • Erection Position External Scaffolding
  • Move Method Horizontal mobile Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Installation Scaffold
  • Transport Package Wooden Case
  • Trademark KOVI
  • Origin Henan China
  • Product Name Electric Lifting Scaffolding
  • Brand Kovi
  • Voltage 220V 50Hz Single Phase
  • Lifting Height 2/3/5/6/8m
  • Power Source Motor
  • Platform Size 1.5*0.8m
  • Actual Load Bearing 300kg
  • Actual Fold Size 1.8*0.8*0.6m
  • Keyword1 Scaffolding Lift Platform
  • Keyword2 Foldable Electric Scaffolding Lift
  • Keyword3 300kg Electric Hydraulic Lift
  • Keyword4 Scaffolding for Sale
  • Keyword5 Electric Lifting Scaffold 6m
  • Platform Static Height 1.6/2.1/3.1/3.6/4.8m
  • Application Warehouse

Product Description

Product Description Warehouse freight electric lifting scaffolding 5m portable electric scaffolding lift platform scaffold lift electric Electric lifting scaffolding features: 1.This machine is mainly used in warehouses and factories to transport goods conveniently and quickly to save manpower. ...

Learn More

Electric Lifting Scaffolding Comparison
Transaction Info
Price US $ 650.00-700.00/ Set US $ 3.5/ Piece US $ 3.5/ Piece US $ 3.5/ Piece US $ 3.5/ Piece
Min Order 1 Sets 500 Pieces 500 Pieces 500 Pieces 500 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram, BOLETO, Mastercard, Visa, e-Checking, PAYLATER L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification - ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: 1 Year;
Warranty: 1 Year;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Installation Scaffold;
Product Name: Electric Lifting Scaffolding;
Brand: Kovi;
Voltage: 220V 50Hz Single Phase;
Lifting Height: 2/3/5/6/8m;
Power Source: Motor;
Platform Size: 1.5*0.8m;
Actual Load Bearing: 300kg;
Actual Fold Size: 1.8*0.8*0.6m;
Keyword1: Scaffolding Lift Platform;
Keyword2: Foldable Electric Scaffolding Lift;
Keyword3: 300kg Electric Hydraulic Lift;
Keyword4: Scaffolding for Sale;
Keyword5: Electric Lifting Scaffold 6m;
Platform Static Height: 1.6/2.1/3.1/3.6/4.8m;
Application: Warehouse;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: Painted, Galvanized;
Colour: Silver, Orange, Red, or as Your Request;
Delivery Time: About 15-30 Days After Confirmation;
Supplier Name

Zhengzhou Kovi Machinery Co., Ltd

China Supplier - Diamond Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier

Di Ao International Trade (Tianjin) Co.,Ltd.

China Supplier - Gold Member Audited Supplier