Formwork
US$32.00-41.90 / Square Meter
View
  • Recommend for you
  • What is Fastener-Type Formwork Support Frame 9
  • What is Template Reliable Support System 2
  • What is Template Structure Stabilizer 5

What is Plastic Formwork for Beams, Slabs and Columns Made of Reusable and Environmentally Friendly Plastic for Factory Building Concrete.

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

100-999 Square Meters US$41.90

1,000-4,999 Square Meters US$38.00

5,000-9,999 Square Meters US$35.00

10,000+ Square Meters US$32.00

Sepcifications

  • After-sales Service Reuse 120 Times
  • Certification CNAS
  • Material Plastic
  • Type Wall Formwork
  • Transport Package Pack
  • Specification 5*60centimeters
  • Origin Shijiazhuang, Hebei
  • Characteristic Length Can Be Customized
  • Green, Environmentally Friendly and Poll Plastic Hollow Building Formwork Is Low-Carbon, En
  • Good Durability Performance It Has Good Wear Resistance and Corrosion Resistan
  • Characteristic2 Free Combination with Other Types of Templates

Product Description

Product Description The combined ribbed plastic formwork is composed of panels, side ribs, transverse ribs and encrypted longitudinal ribs. It adopts the bridge arch design principle and cleverly uses geometric mechanics principles such as arches and triangles to produce a new type of plastic ...

Learn More

Formwork Comparison
Transaction Info
Price US $ 32.00-41.90/ Square Meter US $ 40.00-46.00/ Piece US $ 40.00-46.00/ Piece US $ 41.00-46.00/ Piece US $ 36.00-40.00/ Piece
Min Order 100 Square Meters 1 Pieces 1 Pieces 1 Pieces 200 Pieces
Payment Terms T/T T/T T/T T/T L/C, T/T
Quality Control
Product Certification CNAS ISO ISO ISO -
Management System Certification - ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets - North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$5 Million - US$10 Million
Business Model - OEM, ODM, Own Brand(DKS) OEM, ODM, Own Brand(DKS) OEM, ODM, Own Brand(DKS) OEM, ODM
Average Lead Time - Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays
Product Attributes
Specification
After-sales Service: Reuse 120 Times;
Material: Plastic;
Type: Wall Formwork;
Characteristic: Length Can Be Customized;
Green, Environmentally Friendly and Poll: Plastic Hollow Building Formwork Is Low-Carbon, En;
Good Durability Performance: It Has Good Wear Resistance and Corrosion Resistan;
Characteristic2: Free Combination with Other Types of Templates;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
Warranty: 3 Years;
Material: Plastic;
Type: Wall Formwork;
Surface: Glossy;
Color: Grey, Black;
Size: 1220*2440, 915*2440;
Core: Square, Round;
Supplier Name

Hebei Leige Technology Development Co., Ltd.

Diamond Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Zhanjiang Kingstar Building Material Co., Ltd.

Diamond Member Audited Supplier