Formwork
US$1,200.00-1,500.00 / Ton
  • Recommend for you
  • What is Lianggong Customized Single-Side Climbing Formwork for Pier/Dam/Tunnel Subway/Concrete Protecting Wall
  • What is Manufacturer Adjustable Reusable Light Weight Plastic Formwork for Wall Column Slab Concrete Construction
  • How to Install Lianggong Reusable Customized Steel Construction Building Material Drop Head Slab Formwork for Concrete Casting

What is Customizable Convenient Steel Mould Formwork for Precast Concrete Construction Formwork

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Tons US$1,200.00-1,500.00 / Ton

Sepcifications

  • After-sales Service Online Technical Support
  • Warranty 1 Year
  • Certification ISO
  • Material Steel
  • Type Steel Formwork
  • Transport Package Standard Package
  • Specification Customized
  • Trademark LIANGGONG
  • Origin China
  • After-Sale Service Online Technical Support, Onsite Installation, Ons
  • Project Soluction Capacity Graphic Design, Total Solution for Projects
  • Technical Support Remote or on-Site Instruction
  • Fresh Concrete Pressure Above 60kN/Sqm
  • Surface Treatment Painted
  • Package Standard Package
  • Thickness Customized
  • Color Blue,Red or Customized

Product Description

Steel Formwork Steel Concrete Formwork is fabricated from steel face plate with built-in ribs and flanges in regular modules. Flanges have punched holes at certain intervals for clamp assembly. Steel formwork is strong and durable, therefore can be reused many times in construction. It is easy to ...

Learn More

Formwork Comparison
Transaction Info
Price US $ 1,200.00-1,500.00/ Ton US $ 258.00-360.00/ Set US $ 258.00-360.00/ Set US $ 258.00-360.00/ Set US $ 258.00-360.00/ Set
Min Order 10 Tons 100 Sets 100 Sets 100 Sets 100 Sets
Payment Terms T/T L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification ISO ISO ISO ISO ISO
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia Southeast Asia, Africa, Mid East Southeast Asia, Africa, Mid East Southeast Asia, Africa, Mid East Southeast Asia, Africa, Mid East
Annual Export Revenue US$2.5 Million - US$5 Million US$10 Million - US$50 Million US$10 Million - US$50 Million US$10 Million - US$50 Million US$10 Million - US$50 Million
Business Model OEM, ODM, Own Brand() Own Brand(ZULIN) Own Brand(ZULIN) Own Brand(ZULIN) Own Brand(ZULIN)
Average Lead Time Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Product Attributes
Specification
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel;
Type: Steel Formwork;
After-Sale Service: Online Technical Support, Onsite Installation, Ons;
Project Soluction Capacity: Graphic Design, Total Solution for Projects;
Technical Support: Remote or on-Site Instruction;
Fresh Concrete Pressure: Above 60kN/Sqm;
Surface Treatment: Painted;
Package: Standard Package;
Thickness: Customized;
Color: Blue,Red or Customized;
After-sales Service: Online Technical Support;
Material: Steel Wood;
Type: Wall Formwork;
Color: Green, Blue or Customized;
Application: Basement, Subway, Sewage Treatment Factory, Culver;
Height: 3.0 Meters;
Through-Wall Tie Rod: Without Tie-Rod;
Fixation of Formwork: Anchor Rod, Pull-Push Prop System;
After-sales Service: Online Technical Support;
Material: Steel Wood;
Type: Wall Formwork;
Color: Green, Blue or Customized;
Application: Basement, Subway, Sewage Treatment Factory, Culver;
Height: 3.0 Meters;
Through-Wall Tie Rod: Without Tie-Rod;
Fixation of Formwork: Anchor Rod, Pull-Push Prop System;
After-sales Service: Online Technical Support;
Material: Steel Wood;
Type: Wall Formwork;
Color: Green, Blue or Customized;
Application: Basement, Subway, Sewage Treatment Factory, Culver;
Height: 3.0 Meters;
Through-Wall Tie Rod: Without Tie-Rod;
Fixation of Formwork: Anchor Rod, Pull-Push Prop System;
After-sales Service: Online Technical Support;
Material: Steel Wood;
Type: Wall Formwork;
Color: Green, Blue or Customized;
Application: Basement, Subway, Sewage Treatment Factory, Culver;
Height: 3.0 Meters;
Through-Wall Tie Rod: Without Tie-Rod;
Fixation of Formwork: Anchor Rod, Pull-Push Prop System;
Supplier Name

YANCHENG LIANGGONG FORMWORK CO., LTD.

Diamond Member Audited Supplier

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier