Formwork
US$1,200.00-1,400.00 / Ton
View
  • Recommend for you
  • What is Lianggong Customized Special Metal Steel Formwork System for Wall /Column/Slab
  • What is Column Steel Formwork for Concrete Construction
  • What is Lianggong Formwork Wooden Beam H20 Timber Beam for Wall and Slab

What is Cost-Effective Steel Formwork Trench Shoring System Trench Shield Trench Supporting Trench Box

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

2-9 Tons US$1,400.00

10+ Tons US$1,200.00

Sepcifications

  • After-sales Service Remote Service
  • Warranty 1 Year
  • Certification ISO, CE
  • Material Timber Beam,Steel Waler etc.
  • Type CB180&CB-240
  • Transport Package Package Box, Steel Pallet, Steel Frame, Container
  • Specification Customized
  • Trademark LIANGGONG
  • Origin Yancheng, China
  • Design Style Contemporary
  • Color Green and Blue or Customized
  • Usage Hotel, Wall and Column Concrete Construction
  • Project Solution Capability Graphic Design, 3D Model Design, Total Solution Fo
  • Package Standard Package

Product Description

Product Description Lightweight Trench Box Trench boxes are used in trench shoring as a form of trench ground support. They offer an affordable lightweight trench lining system. They are most commonly used for ground works operations such as installing utility pipes where ground movement is not ...

Learn More

Formwork Comparison
Transaction Info
Price US $ 1,200.00-1,400.00/ Ton US $ 23.00-55.00/ Piece US $ 8.00-16.00/ Piece US $ 6.00-14.00/ Piece US $ 6.00-14.00/ Piece
Min Order 2 Tons 100 Pieces 1 Pieces 50 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification ISO, CE ISO, CE ISO, ROHS, CE ISO, ROHS, CE ISO, ROHS, CE
Management System Certification ISO 9001 - ISO 9001, BSCI ISO 9001, BSCI ISO 9001, BSCI
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM Own Brand Own Brand Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: Remote Service;
Warranty: 1 Year;
Material: Timber Beam,Steel Waler etc.;
Type: CB180&CB-240;
Design Style: Contemporary;
Color: Green and Blue or Customized;
Usage: Hotel, Wall and Column Concrete Construction;
Project Solution Capability: Graphic Design, 3D Model Design, Total Solution Fo;
Package: Standard Package;
After-sales Service: Online Support;
Warranty: 1 Year;
Material: Steel Wood;
Type: Wall Formwork;
Specifications: 45# Steel;
Colour: Primary;
Usage: Building Construction;
Technical Processing: Hot Rolled;
Surface: F Type Flattening;
MOQ: 100pieces;
After-sales Service: Online Technical Support, on-Site Installation, on;
Warranty: 1 Year;
Material: Steel;
Type: Wall Formwork;
Surface: Paint, Galvanized;
Date of Delivery: 15-20days;
Thickness: 2mm-3mm;
Usage: Building Project;
Length: 2`-15`M;
After-sales Service: Online Technical Support, on-Site Installation, on;
Warranty: 1 Year;
Material: Steel;
Type: Wall Formwork;
Surface: Paint, Galvanized;
Date of Delivery: 15-20days;
Thickness: 2mm-3mm;
Usage: Building Project;
Length: 2`-15`M;
After-sales Service: Online Technical Support, on-Site Installation, on;
Warranty: 1 Year;
Material: Steel;
Type: Wall Formwork;
Surface: Paint, Galvanized;
Date of Delivery: 15-20days;
Thickness: 2mm-3mm;
Usage: Building Project;
Length: 2`-15`M;
Supplier Name

YANCHENG LIANGGONG FORMWORK CO., LTD.

China Supplier - Diamond Member Audited Supplier

QINGDAO JINYING MACHINERY CO., LTD.

China Supplier - Diamond Member Audited Supplier

Tianjin Honest Steel Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Tianjin Honest Steel Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Tianjin Honest Steel Co., Ltd.

China Supplier - Diamond Member Audited Supplier