Specification |
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe, Industry/Construction;
Material: Red Copper;
Shape: Plate;
Alloy: Alloy;
Color: Golden;
Standard: ASTM;
Width: 10-1500mm or Customized;
Price Term: Fob CIF CFR EXW DDU DDP;
Payment Term: 30% Deposit + 70% Balance T/T;
Delivery Time: Within 10 Working Days;
Sample: Provided;
Material Grade: C2800 C2720 C2680 C2600;
Related Grade: C1020 C1100 C1221 C1201 C1220;
|
Type: Copper Strips;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass, Red Copper, Bronze;
Shape: Strip;
Alloy: Alloy;
Color: Yellow, Red, Golden, Purple;
Standard: ASTM/EN/DIN;
Width: 4mm~1000mm;
Delivery Time: 20 Days or as Requirement;
Trade Terms: FOB, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 1PC for Stock, 6 Tons for Order;
Key Words: C11907 Copper Strips Equivalences;
|
Type: Copper Strips;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass, Red Copper, Bronze;
Shape: Strip;
Alloy: Alloy;
Color: Yellow, Red, Golden, Purple;
Standard: ASTM/En/DIN;
Width: 4mm~1000mm;
Delivery Time: 20 Days or as Requirement;
Trade Terms: Fob, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 1PC for Stock, 6 Tons for Order;
Key Words: C19400 Copper Properties;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM/GB/JIS/En/DIN;
Price Term: EXW/Fob/CIF/DDP;
Delivery Time: 5-7 Working Days;
Payment Term: L/C, T/T, D/P, etc;
Product Name: Brass Plate;
Surface: Polish;
Technique: Hot Rolled;
Usage: Construction Decoration;
Process: Bright;
|
Type: Copper Strips;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass, Red Copper, Bronze;
Shape: Strip;
Alloy: Alloy;
Color: Yellow, Red, Golden, Purple;
Standard: ASTM/En/DIN;
Width: 4mm~1000mm;
Delivery Time: 20 Days or as Requirement;
Trade Terms: Fob, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 1PC for Stock, 6 Tons for Order;
Key Words: C11000 Copper Chemical Composition;
|