Specification |
Condition: New;
Standard: ASTM;
Customized: Customized;
Material: Carnon Steel;
Application: Machinery;
Material Options: Stainless Steel/Steel Alloy/Brass/Bronze/Titanium;
Tolerance: +/-0.1mm;
Sample Lead Time: 15 Dyas;
Mass Production: 30 Days;
Capability: 500, 000, 000PCS/Year;
Min Qty: 100PCS;
Surface Treatment: Plating/Coating/Anodizing;
Roughness: Ra1.6;
|
Casting Method: Investment Casting;
Casting Form Material: G25crmo4, G35, Wcb;
Casting Metal: Cast Steel;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: 0.005mm-0.01mm-0.1mm;
Coating: Zinc oxide;
Machining Tolerance: CT4-8 for Steel Casting;
Standard: According to Customer Requirement;
Customized: Customized;
Application: Machinery Parts;
Material: G25crmo4, G35, Wcb;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Package for Steel Casting Shaft: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steel Casting Shaft;
Service: OEM, ODM for Steel Casting Shaft;
|
Casting Method: Investment Casting;
Casting Form Material: G25crmo4, G35, Wcb;
Casting Metal: Cast Steel;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: 0.005mm-0.01mm-0.1mm;
Coating: Zinc oxide;
Machining Tolerance: CT4-8 for Steel Casting;
Standard: According to Customer Requirement;
Customized: Customized;
Application: Machinery Parts;
Material: G25crmo4, G35, Wcb;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Package for Steel Casting Shaft: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steering Shaft;
Service: OEM, ODM for Steering Shaft;
|
Casting Method: Investment Casting;
Casting Form Material: G25crmo4, G35, Wcb;
Casting Metal: Cast Steel;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: 0.005mm-0.01mm-0.1mm;
Coating: Zinc oxide;
Machining Tolerance: CT4-8 for Steel Casting;
Standard: According to Customer Requirement;
Customized: Customized;
Application: Machinery Parts;
Material: G25crmo4, G35, Wcb;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for 4140 Steel Shaft;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Package for Steel Casting Shaft: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for 4140 Steel Shaft;
Service: OEM, ODM for 4140 Steel Shaft;
|
Casting Method: Investment Casting;
Casting Form Material: G25crmo4, G35, Wcb;
Casting Metal: Cast Steel;
Casting Form Usage Count: Permanent;
Surface Treatment: Dacromat Coating, Finish Painting;
Surface Roughness: 0.005mm-0.01mm-0.1mm;
Coating: Zinc oxide;
Machining Tolerance: CT4-8 for Steel Casting;
Standard: According to Customer Requirement;
Customized: Customized;
Application: Machinery Parts;
Material: G25crmo4, G35, Wcb;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Mild Steel Shaft;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Package for Steel Casting Shaft: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Mild Steel Shaft;
Service: OEM, ODM for Mild Steel Shaft;
|