Specification |
Casting Method: Lost Wax Investment Casting;
Process: Lost Wax Investment Casting;
Molding Technics: Gravity Casting;
Application: Construction Machinery;
Material: Cast Steel;
Surface Preparation: Shot Blast+Clean by Ultrasonic Cleaning Machine;
Surface Roughness: Ra12.5;
Machining Tolerance: +/-0.01mm;
Standard: ASTM. AISI. DIN. BS. JIS. NF. as. AAR;
Heat Treatment: Quench and Temper by 2 Set Mesh Belt Furnaces;
Machining Facility: 20 Machining Centers+50 Nc Machines;
Inspection: Mt/Ut/Rt/100% Visual+100% Gage/CMM;
Dimensions: OEM Customized/Customer's Drawing;
Tolerance: as Drawing;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Precision Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Machinery Parts;
Material: Wcb, Zg25crmo4, Zg35, Zg45;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra 0.8~3.2;
Machining Tolerance: From 0.005mm-0.01mm-0.1mm;
Standard: ASTM;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Finish Treatment: Dacromat Coating, Finish Painting;
Machining Tolearnce: From 0.005mm-0.01mm-0.1mm;
Machined Surface Quality: Ra 0.8-Ra3.2 According to Customer Requirement;
Package for Steel Casting: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steel Casting;
Service for Steel Casting: Metal Parts Solution as Per Customer's Drawing;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Precision Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Machinery Parts;
Material: Wcb, Zg25crmo4, Zg35, Zg45;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra 0.8~3.2;
Machining Tolerance: From 0.005mm-0.01mm-0.1mm;
Standard: ASTM;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Finish Treatment: Dacromat Coating, Finish Painting;
Machining Tolearnce: From 0.005mm-0.01mm-0.1mm;
Machined Surface Quality: Ra 0.8-Ra3.2 According to Customer Requirement;
Package for Steel Casting: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steel Casting;
Service for Steel Casting: Metal Parts Solution as Per Customer's Drawing;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Precision Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Machinery Parts;
Material: Wcb, Zg25crmo4, Zg35, Zg45;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra 0.8~3.2;
Machining Tolerance: From 0.005mm-0.01mm-0.1mm;
Standard: ASTM;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Finish Treatment: Dacromat Coating, Finish Painting;
Machining Tolearnce: From 0.005mm-0.01mm-0.1mm;
Machined Surface Quality: Ra 0.8-Ra3.2 According to Customer Requirement;
Package for Steel Casting: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steel Casting;
Service for Steel Casting: Metal Parts Solution as Per Customer's Drawing;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Precision Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Machinery Parts;
Material: Wcb, Zg25crmo4, Zg35, Zg45;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra 0.8~3.2;
Machining Tolerance: From 0.005mm-0.01mm-0.1mm;
Standard: ASTM;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Finish Treatment: Dacromat Coating, Finish Painting;
Machining Tolearnce: From 0.005mm-0.01mm-0.1mm;
Machined Surface Quality: Ra 0.8-Ra3.2 According to Customer Requirement;
Package for Steel Casting: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steel Casting;
Service for Steel Casting: Metal Parts Solution as Per Customer's Drawing;
|