PPR Pipe Fitting Mould/Mold (MELEE MOULD -279)

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1 Piece US$5,000.00

2+ Pieces US$10,000.00

Sepcifications

  • Shaping Mode Injection Mould
  • Application Commodity
  • Installation Manual Installation
  • Transport Package Wooden Case
  • Specification SGS
  • Trademark MELEEMOULD
  • Origin Huangyan, Taizhou
  • Material PPR

Product Description

Detail description of PPR Pipe fitting Moulds/molds. Plastic Pipe Fitting Mould, Pipe Fitting Mould, PVC Pipe Fitting Mould/mold. Product Name: Plastic Pipe Moulds/molds. Product material: ABS, PP, PE or as per customer requirement. Plastic Fitting Moulds/molds cavity: As per customer ...

Learn More

Ppr Pipe Fitting Mould Comparison
Transaction Info
Price US $ 5,000.00-10,000.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece US $ 10,000.00-20,000.00/ Piece
Min Order 1 Pieces 1 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms FOB, EXW - - - -
Payment Terms T/T, Western Union L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification - ISO ISO ISO ISO
Management System Certification - ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM - - - -
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: Injection Mould;
Application: Commodity;
Installation: Manual Installation;
Material: PPR;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Compound Die;
Application: Motorcycle;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Lkm/Hasco;
Customized: Customized;
Mould Quality Control: Professional QC;
Heat Treatment: Nitriding;
Mould Base: S50c/C45;
Mould Runner System: Hot Runner or Cold;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Mach Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Mould Surface: Polish or Texture;
Design: Ready;
T1 Days: 50-60days;
Supplier Name

ZHEJIANG MELEE MOULD CO., LTD.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier