Deck Adaptor (Deck Leveler) for Cuplock Scaffold

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$1,200.00-1,500.00 / Ton

Sepcifications

  • Material Steel
  • Type Mobile
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Wall Hanging Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position Internal Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type System
  • Construction Properties Building Scaffold
  • Transport Package Steel Pallet
  • Specification OD48.3 x 3.2mm
  • Trademark METEC
  • Origin China
  • Factory Certifiation ISO9001
  • Tube Dimaeter 48.3*3.2mm
  • Finished Hot DIP Galvanized
  • Certification CE, TUV, SGS

Product Description

Deck Adapter / Deck Leveler The deck adapter fits on the top of an access vertical and has a low-profile upper cup which screw down to lie flush with adjacent boards. Cuplock scaffolding system Hot dip galvanized Cuplock scaffolding system is a well-proven heavy-duty support system. It is ...

Learn More

Deck Adaptor Comparison
Transaction Info
Price US $ 1,200.00-1,500.00/ Ton US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece
Min Order 1 Tons 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification CE, TUV, SGS ISO, Ce, SGS ISO, Ce, SGS ISO, Ce, SGS ISO, Ce, SGS
Management System Certification ISO 9001 ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets North America, South America, Western Europe Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Wall Hanging Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: System;
Construction Properties: Building Scaffold;
Factory Certifiation: ISO9001;
Tube Dimaeter: 48.3*3.2mm;
Finished: Hot DIP Galvanized;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Supplier Name

Wuxi Metec Metal Co., Ltd.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier