Bridge Ledger for Ring Lock Scaffolding

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$9.50 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Integral Lifting Scaffolding
  • Scaffolding Part Type System Scaffold
  • Construction Properties Building Scaffold
  • Transport Package Steel Pallet
  • Specification Steel
  • Trademark METEC
  • Origin China
  • Finished Hot DIP Galvanized
  • Certificate CE, TUV, SGS
  • Factory Certificate ISO9001
  • Steel Class Q345, Q235

Product Description

Bridge ledger for ringlock scaffolding Material: Q345, Q235 Finished:Hot dip galvanized Length: 2' to10' Item Description Weight RDL52 5′2″ Double Ledger 1572mm 12.4 kg RDL60 6′ Double Ledger 1829mm 13.0 kg RDL69 6'9″ Double Ledger 2072mm 15.6 kg RDL70 ...

Learn More

Bridge Ledger Comparison
Transaction Info
Price US $ 9.5/ Piece US $ 1.30-1.50/ Piece US $ 1.30-1.50/ Piece US $ 1.30-1.50/ Piece US $ 1.30-1.50/ Piece
Min Order 100 Pieces 1000 Pieces 1000 Pieces 1000 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification CE, TUV, SGS - - - -
Management System Certification ISO 9001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001 OHSAS/ OHSMS 18001
Trade Capacity
Export Markets North America, South America, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Integral Lifting Scaffolding;
Scaffolding Part Type: System Scaffold;
Construction Properties: Building Scaffold;
Finished: Hot DIP Galvanized;
Factory Certificate: ISO9001;
Steel Class: Q345, Q235;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Formwork;
Construction Properties: Building Scaffold;
Size: 17mm;
Raw Material: C45;
Item: Scaffolding Formwork Nut;
Sureface Treatment: Galvanzied;
Payment: T/T;
Delivery: 30 Days After Confrimation;
Package: Steel Pallets;
Surface: Plating;
Note: OEM Service Is Available;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Formwork;
Construction Properties: Building Scaffold;
Size: 17mm;
Raw Material: C45;
Item: Scaffolding Formwork Nut;
Sureface Treatment: Galvanzied;
Payment: T/T;
Delivery: 30 Days After Confrimation;
Package: Steel Pallets;
Surface: Plating;
Note: OEM Service Is Available;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Formwork;
Construction Properties: Building Scaffold;
Size: 17mm;
Raw Material: C45;
Item: Scaffolding Formwork Nut;
Sureface Treatment: Galvanzied;
Payment: T/T;
Delivery: 30 Days After Confrimation;
Package: Steel Pallets;
Surface: Plating;
Note: OEM Service Is Available;
Material: Steel;
Type: Fixed;
Structural Style: Tower Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Formwork;
Construction Properties: Building Scaffold;
Size: 17mm;
Raw Material: C45;
Item: Scaffolding Formwork Nut;
Sureface Treatment: Galvanzied;
Payment: T/T;
Delivery: 30 Days After Confrimation;
Package: Steel Pallets;
Surface: Plating;
Note: OEM Service Is Available;
Supplier Name

Wuxi Metec Metal Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier