Specification |
Condition: New;
Standard: DIN, ASTM, GB, JIS, ANSI;
Customized: Customized;
Material: Copper;
Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery, Door Frame;
Quality Control: 100% Inspection;
Gage Calibration: Third-Party Testing Organization;
Tolerance: +/- 0.01-0.05mm;
Thread Protection: Custom Threaded Protective Sleeve;
Cleaning Method: Ultrasonic Cleaning;
Surface Treatment: Customer's Request;
Samples: Avaiable;
MOQ: 10 Kg;
Sample Time: 3-5 Days;
Mass Production Time: 15-20 Days;
|
Condition: New;
Customized: Customized;
Material: Brass/Aluminum/Titanium/Stainless Steel etc;
Finish: Anodized, Sandblasting, etc;
Tolerance: +/- 0.02mm;
Scrap Rate: 1%~2%;
MOQ: 100PCS;
Leading Time: 10~15days;
|
Condition: New;
Standard: GB;
Customized: Customized;
Material: Brass;
Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery;
Material Available: Aluminum/ Stainless Steel/ Brass/ Steel/ Plastic;
Process: CNC Milling/ Turning;
Surface Finish: Sandblasted/ Anodized/ Plated/ Customized;
Tolerance: 0.01-0.02mm;
Inspection: 100% Inspection;
MOQ: 10 PCS;
Leadtime: 10-20 Days (According to Quantity);
Drawing Format: Pdf/.Dwg/.Igs./.STP/ X_T. etc;
Shippment: DHL, UPS, FedEx or as Your Request;
Centificate: ISO 9001: 2008;
|
Condition: New;
Customized: Customized;
Material: Brass/Aluminum/Titanium/Stainless Steel etc;
Finish: Anodized, Sandblasting, etc;
Tolerance: +/- 0.02mm;
Scrap Rate: 1%~2%;
MOQ: 100PCS;
Leading Time: 10~15days;
|
Condition: New;
Customized: Customized;
Material: Brass/Aluminum/Titanium/Stainless Steel etc;
Finish: Anodized, Sandblasting, etc;
Tolerance: +/- 0.02mm;
Scrap Rate: 1%~2%;
MOQ: 100PCS;
Leading Time: 10~15days;
|