Specification |
Casting Method: pressure Crystallization;
Process: Lost Wax Casting;
Molding Technics: Pressure Casting;
Application: Machinery Parts;
Material: Alloy Steel;
Surface Preparation: Polishing;
Surface Roughness: Ra0.4;
Machining Tolerance: +/-0.02mm;
Standard: AISI;
Size: What You Want;
Surface: Zinc,Sand Blasting, Painted;
Mt: Steel,Iron, Alloy;
Packing: Wooden Box;
|
Casting Method: Vacuum Aspirated Casting;
Process: Lost Wax Casting;
Molding Technics: Gravity Casting;
Application: Hardware;
Material: Metal;
Surface Preparation: Spray-Paint;
Surface Roughness: Ra0.4;
Machining Tolerance: +/-0.15mm;
Standard: AISI;
Raw Material: Zinc & Zinc Alloy. Za-3, Za-5, Za-8;
Raw Material2: Aluminum & Aluminum Alloy A360, A380, A390, ADC-;
Finishing1: Zinc/Chrome Plating, PVD, Ect;
Finishing2: Chrome Plating, Sandblasting, Painting, Anodizing;
Product Name: Steel Casting;
Product Process: Lost Wax Casting;
Product Process2: Stainless Steel Casting;
Product Process 3: Iron Casting;
Product Process 4: Casting;
Product Name 2: Investment Stainless Steel Casting Marine Parts;
|
Casting Method: Thermal Gravity Casting;
Process: Investment Casting;
Molding Technics: Gravity Casting;
Application: Hardware;
Material: Stainless Steel;
Surface Preparation: Polishing;
Surface Roughness: Ra3.2;
Machining Tolerance: +/-0.01mm;
Standard: ASTM;
Deliver Time: 25-35 Days;
|
Casting Method: Thermal Gravity Casting;
Process: Investment Casting;
Molding Technics: Gravity Casting;
Application: Hardware;
Material: Carbon Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra6.3;
Machining Tolerance: +/-0.02mm;
Standard: ASTM;
Deliver Time: 25-35 Days;
|
Casting Method: Thermal Gravity Casting;
Process: Investment Casting;
Molding Technics: Gravity Casting;
Application: Hardware;
Material: Carbon Steel;
Surface Preparation: Sand Blast;
Surface Roughness: Ra6.3;
Machining Tolerance: +/-0.02mm;
Standard: ASTM;
Deliver Time: 25-35 Days;
|