Specification |
Material: Plastic;
Application: Medical, Household, Electronics, Automotive;
Prototype Process: SLA, Vacuum Forming, CNC, etc.;
Molding Process: Injection Molding;
Service: OEM/ODM/Obm, Custom Logo / Packaging, 3D Design Dr;
Sample Time: 3-7 Days;
Lead Time: 10-20 Days;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Plastic Molding Parts Maker;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Material: ABS/PP/PS/PE/PVC/PA6/PA66/PMMA, ABS;
Application: Medical, Household, Electronics, Automotive;
Product Name: Injection Plastic Auto Mould;
Mould Life: 300000-500000 Shots;
Mould Material: P20/718/738/Nak80/S136;
Process: Injection Moulding;
Finish: Pitting The Word, Mirror Finish, Matte Surface;
Package: Wooden Case Package;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Double Colors Plastics Injection Molds;
Mould Life: 300, 000~1, 000, 000cyces;
Mould Material: S45c, P20, 718, 718h, 738, 738h, etc;
Process: Injection Molding;
Finish: Matte or Polishing Surface;
Hot Runner: Moldmaster, Incoe, Yudo, Heitec, Gunther, etc;
Mold Type: Insert Mold, Over Mold, Shuttle Mold;
Surface Finish: Texture, Smooth, Glossy or Mirror Polished, etc;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Plastic Injection Molds;
Product Material: ABS, PVC, PC, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|