Specification |
Casting Method: Thermal Gravity Casting;
Process: Investment Casting;
Molding Technics: CNC Machining;
Application: Machinery Parts/Auto Parts/Hardware;
Material: Nickel Alloy/Titanium/Aluminium/Ect;
Surface Preparation: Polishing/Sand Blast/Spray-Paint;
Surface Roughness: Ra 0.6-Ra3.2 According to Customer Requirement;
Machining Tolerance: +/-0.01mm;
Standard: ASTM;
Service: Gas Steam Turbine Compressor Wheel;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Investment Casting;
Molding Technics: Investment Casting, Lost Wax Casting;
Application: Vehicle, Agriculture Machine, Construction Machine;
Material: Stainless Steel 304, 316, 304L, 316L as Clients Re;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra6.3~12.5;
Machining Tolerance: CT 8~9;
Standard: ASTM/AISI/JIS/DIN etc;
Casting Blank Size: as Customer Request;
Casting Material: Stainless Steel 316, Option 304, CF8m;
Blank Process: Lost Foam Castings, Investment Casting;
Casting Tolerance: CT4-8 for Scs13 Stainless Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Surface Treatment: Dacromat Coating, Finish Painting;
Package: Multilayer Wooden Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Scs13 Stainless Steel Casting;
Service: Technical Support for Scs13 Stainless Steel Castin;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Investment Casting;
Molding Technics: Investment Casting, Lost Wax Casting;
Application: Vehicle, Construction Machinery, Agriculture Mach;
Material: Stainless Steel 304, 316 etc;
Surface Preparation: Powder Coating and Painting;
Surface Roughness: Ra6.3~12.5;
Machining Tolerance: ISO2768-M;
Standard: ASTM/AISI/JIS/DIN etc;
Manufacturing Process: Investment Casting, Stainless Steel Casting;
Casting Tolerance: CT4-8 for Stainless Steel Pump Impeller Casting;
Finish Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Heat Treatment: Normalization, Annealing, Quenching and Tempering;
Surface Finish: Surface Passivation, Electric Polish;
Rough Surface Roughness: Ra3.2-25 for Stainless Steel Pump Impeller Casting;
Package: Multilayer Wooden Box/Pallet, with Big Plastic Bag;
Lead Time: 45 Days for Stainless Steel Pump Impeller Casting;
Service: OEM/ODM for Stainless Steel Pump Impeller Casting;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Investment Casting;
Molding Technics: Investment Casting, Lost Wax Casting;
Application: Vehicle, Construction Machinery, Agriculture Mach;
Material: Stainless Steel 304, 316 etc;
Surface Preparation: Powder Coating and Painting;
Surface Roughness: Ra6.3~12.5;
Machining Tolerance: ISO2768-M;
Standard: ASTM/AISI/JIS/DIN etc;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Stainless Steel Investment Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Finish Treatment: Dacromat Coating, Finish Painting;
Machining Tolearnce: From 0.005mm-0.01mm-0.1mm;
Machined Surface Quality: Ra 0.8-Ra3.2 According to Customer Requirement;
Package for Steel Casting: Multilayer Wooden Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Stainless Steel Investment Casting;
Service for Steel Casting: Metal Parts Solution as Per Customer's Drawing;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Precision Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Machinery Parts;
Material: Wcb, Zg25crmo4, Zg35, Zg45;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra 0.8~3.2;
Machining Tolerance: From 0.005mm-0.01mm-0.1mm;
Standard: ASTM;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT4-8 for Steel Casting Parts Investment Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Surface Finish Treatment: Dacromat Coating, Finish Painting;
Machining Tolearnce: From 0.005mm-0.01mm-0.1mm;
Machined Surface Quality: Ra 0.8-Ra3.2 According to Customer Requirement;
Package for Steel Casting: Multilayer Wooden Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Steel Casting Parts Investment Casting;
Service for Steel Casting: Metal Parts Solution as Per Customer's Drawing;
|