Specification |
After-sales Service: 360 Degree After Sales;
Warranty: 12 Months;
Type: Seamless;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Standard: API ASTM DIN JIS En etc;
|
Type: Welded;
Technique: Argon-Arc Welding;
Material: Stainless Steel;
Surface Treatment: Ba or 2b;
Usage: Wood, Oil, Solid Fuels;
Section Shape: Round;
Size: 3"4"5"6"7"8"10"12";
Thickness: 0.45mm-1.2mm;
Length: 120mm-1200mm;
Insulation Thickness: 25mm;
Standard: En 1856-1:2009 T600-N1-W-V2-L50050-G50;
|
Type: Welded;
Technique: Argon-Arc Welding;
Material: Stainless Steel;
Surface Treatment: Polished Pr Ba Finishing;
Usage: Wood, Oil, Solid Fuels;
Section Shape: Round;
Size: 5"6"7"8"10"11"12";
Standard: En 1856-1, UL103;
Thickness: 0.4mm-1.0mm;
Insulation Resistance High Temperature: 1, 200 Degree;
Fiber Diameter: ≥ 0.006 Micron;
Length: 1200mm-120mm;
|
Type: Welded;
Technique: Argon-Arc Welding;
Material: Stainless Steel;
Surface Treatment: Polished Pr Ba Finishing;
Usage: Wood, Oil, Solid Fuels;
Section Shape: Round;
Size: 5"6"7"8"10"11"12";
Standard: En 1856-1, UL103;
Outer Wall Hardness: 177hv;
Inner Wall Hardness: 200hv;
Outer Wall Tensile Strength: 480MPa/mm2;
Inner Wall Tensile Strength: 690MPa/mm2;
|
Type: Welded;
Technique: Argon-Arc Welding;
Material: Stainless Steel;
Surface Treatment: Polished Pr Ba Finishing;
Usage: Wood, Oil, Solid Fuels;
Section Shape: Round;
Size: 5"6"7"8"10"11"12";
Color: Can Be Customized/Sliver & Black Can Be Customized;
Standard: En 1856-1, UL103 Certificate CE, UL103;
Outer Wall Hardness: 177hv;
Inner Wall Hardness: 200hv;
Nner Wall Tensile Strength: 690MPa/mm2;
Insulation Material: Cotton Insulation-Aluminum Silicate Insulation;
Resistance High Temperature: 1, 200 Degree;
Insulation Thickness: 25mm;
Packaging Details: Standard Export Packing;
Delivery Detail: 25 Days After The Order Payment;
Used: Wood Fireplaces, Pellet Fireplaces, Stove, Boiler,;
|