Drainage Panel Machine
US$50,000.00 / Set
View
  • Recommend for you
  • What is Plastic Drain Basket Injection Mould
  • What is CO2 Foamed EPE Machine
  • What is Pet Sheet Extrusion Production Line

What is CE PE Dimpled Water Drainage Panel Sheet Machine

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Set US$50,000.00 / Set

Sepcifications

  • Transport Package Plastic Film, Wooden Pallets, Boxes
  • Specification 2m, 3m, 4m
  • Trademark JUNSHENG
  • Origin Jiaxing, China

Product Description

CE PE Dimpled Water Drainage Panel Sheet Machine As a machine and products manufacturer, we have 2 factories, and can produce drainage dimpled panels according to different clients different requirements. In our product factory, we have 5 sets drainage panel machines. Brief introduction: 1> ...

Learn More

Drainage Panel Machine Comparison
Transaction Info
Price US $ 50000/ Set US $ 500/ Piece US $ 500/ Piece US $ 2.66-6.35/ Piece US $ 2099/ Piece
Min Order 1 Sets 500 Pieces 500 Pieces 500 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram T/T
Quality Control
Product Certification - ISO9001:2015 ISO9001:2015 - -
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001, ISO 14001, IATF16949, HSE ISO 9001
Trade Capacity
Export Markets Domestic Europe Europe North America, South America, Eastern Europe, Mid East, Eastern Asia, Western Europe South America, Southeast Asia/ Mideast, Africa
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, ODM OEM, ODM OEM, ODM, Own Brand -
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Surface Treatment: Galvanizing, Eletroplating, Painting, Powder;
Market: USA, Europe, Australia, Japan, UK, Italy, German;
Service: Machining;
Production Management: 5s System;
Delivery Time: 2-6 Weeks After Prepayment;
Thickness: 0.2mm ~12mm;
Tolerance: 0.01-0.1mm;
MOQ: 100PCS;
Surface Treatment: Galvanizing, Eletroplating, Painting, Powder;
Market: USA, Europe, Australia, Japan, UK, Italy, German;
Service: Machining;
Production Management: 5s System;
Delivery Time: 2-6 Weeks After Prepayment;
Thickness: 0.2mm ~12mm;
Tolerance: 0.01-0.1mm;
MOQ: 100PCS;
Materials: Aluminum Stainless Steel Iron Carbon Steel;
Place of Origin: Zhejiang/Ningbo;
Process: CNC Turing, CNC Machining, Anod;
Shipping Way: Express, Air Shipment or Ocean Shipment;
Salt Rejection Rate: More Than 97%;
Recovery Rate: 50%-75%;
Pump: Cnp;
Sterilizer: UV, Ozone;
Power: 2.5kw;
Power Supply: AC 380V 50Hz 3phase or 220V 50Hz Single Phase;
Size (mm): 2310X630X1840;
Tank Material: FRP/SUS;
Valve: Automatic / Manual;
Weight: 450kg;
Supplier Name

Jiaxing Junsheng Machinery Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Hangzhou Hengli Metal Processing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Hangzhou Hengli Metal Processing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo Tianhui Machine Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Guangzhou Kai Yuan Water Treatment Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier