Formwork
Negotiable
View
  • Recommend for you
  • What is Standard Certified Cuplock Prop Shore Shoring Scaffolding System
  • What is Hot Sale Steel Formwork Used for Concrete Pouring of Building Construction
  • What is Slab Formwork Peri Doka Light Weight Aluminum Formwork for Concrete Construction

What is Green Formwork Beamless Concrete Slab Handset Shoring Aluminium Formwork

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1000 Square Meters Negotiable

Sepcifications

  • Certification ISO
  • Material Aluminum
  • Type Slab Formwork
  • Transport Package Packages
  • Specification MB 6′*4′ MB6′*3′
  • Trademark GF
  • Origin China

Product Description

#Green Formwork - best concrete formwork solution to flatslab or beam-less structure projects An advance aluminium/steel panel prop formwork system which allow early stripping operation. It provides suitable formwork solutions to flatslab or beam-less concrete ...

Learn More

Formwork Comparison
Transaction Info
Price Negotiable US $ 55.00-101.00/ Square Meter US $ 1.54-1.56/ Meter US $ 165.00-505.00/ Set US $ 3,000.00-10,000.00/ Set
Min Order 1000 Square Meters 500 Square Meters 1000 Meters 1 Sets 10 Sets
Payment Terms L/C, T/T L/C, T/T L/C, T/T T/T L/C, T/T
Quality Control
Product Certification ISO ISO - ISO, CE, SGS ISO
Management System Certification ISO 9001 ISO 9001 - ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe Southeast Asia, Africa, Mid East Southeast Asia, Africa, Oceania, Mid East, Western Europe North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia Southeast Asia, Africa, Mid East
Annual Export Revenue US$10 Million - US$50 Million US$10 Million - US$50 Million US$5 Million - US$10 Million US$2.5 Million - US$5 Million US$10 Million - US$50 Million
Business Model OEM, Own Brand(Green Formwork) Own Brand(ZULIN) OEM OEM, ODM, Own Brand() Own Brand(ZULIN)
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Product Attributes
Specification
Material: Aluminum;
Type: Slab Formwork;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel Wood;
Type: Slab Formwork;
Color: Yellow, Blue or Customized;
Length: 3300~5000 mm;
Width: 2440~3600 mm;
Thickness of Slab: 100~500mm;
Bearing Capacity: 5~15kn/Square Meter;
Auxiliary Equipment: Lifting Fork, Shifting Trolley;
Certificate: SGS / ISO9001:2015;
Application: Slab Pouring;
Material: Galvanized Plate;
Type: Wall Formwork;
Length: 2m-3m;
Rib Height: 10mm-20mm;
After-sales Service: One-Stop Service;
Warranty: One Year;
Material: Timber Beam and Steel Waling;
Type: Beam Formwork;
Adjustable Range: 1.45-5.9m;
Application: Elevator, Equipment Shaft and Stairwell;
Project Solution Capacity: Graphic Design, 3D Model Design, Total Solution Fo;
After Sale Service: Online Technical Support, Onsite Installation;
Usage: Concrete Pouring;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel Wood;
Type: Climbing Formwork;
Color: Blue, Green, White or Customized;
Protection Height: 2.5 Floors or 4.5 Floors;
Width of Operating Platform: 900mm;
Number of Platform: 0- 5;
S.W.L. of The Operating Platform: 1.0-3.0kn/Square Meter;
S.W.L. of Unloading Platform: 2 Tons;
Supplier Name

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier

ANPING CHIYUN WIRE MESH MANUFACTURING CO., LTD

Gold Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

Diamond Member Audited Supplier

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier