Factory Price 3m Scaffolding High Load Capacity Shoring Prop for Construction

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

200-299 Pieces US$150.00

300+ Pieces US$50.00

Sepcifications

  • After-sales Service Engineer on-Site Guidance.
  • Warranty 5 Years
  • Certification ISO, CE
  • Material Aluminum
  • Type Slab Formwork
  • Transport Package Metal Packages
  • Specification multi-250-550
  • Origin Qingdao
  • Aluminium T6 6082
  • Standard AS/NZS1576.3
  • Load Capacity 90kN

Product Description

Product Description Prop Model Aluminium Prop250 Aluminium Prop350 Aluminium Prop480 Aluminium Prop625 Min Length mm 1450 1980 2600 4300 Max Length mm 2500 3500 4800 6250 Weight kgs 15.50 19.30 24.30 34.10 Min-Max Load Kn 60-70 42-88 25-85 20-56 Company Profile This kind ...

Learn More

Mobile Scaffold Comparison
Transaction Info
Price US $ 50.00-150.00/ Piece US $ 2,999.00-6,999.00/ Set US $ 2,999.00-6,999.00/ Set US $ 2,999.00-6,999.00/ Set US $ 2,999.00-6,999.00/ Set
Min Order 200 Pieces 1 Sets 1 Sets 1 Sets 1 Sets
Payment Terms L/C, T/T, Western Union T/T, Paypal T/T, Paypal T/T, Paypal T/T, Paypal
Quality Control
Product Certification ISO, CE ISO, CE ISO, CE ISO, CE ISO, CE
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia North America, South America, Southeast Asia, Africa, Mid East, Eastern Asia
Annual Export Revenue US$10 Million - US$50 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million
Business Model OEM, Own Brand(Green Formwork) OEM, ODM, Own Brand() OEM, ODM, Own Brand() OEM, ODM, Own Brand() OEM, ODM, Own Brand()
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Product Attributes
Specification
After-sales Service: Engineer on-Site Guidance.;
Warranty: 5 Years;
Material: Aluminum;
Type: Slab Formwork;
Aluminium: T6 6082;
Standard: AS/NZS1576.3;
Load Capacity: 90kN;
After-sales Service: One-Stop Service;
Warranty: One Year;
Material: Steel;
Type: Climbing Formwork;
Height of Bracket: 12-17 Meters;
Height of Climbing: 3-6m;
Application: High Rise Building/Bridge Pier/Shear Wall;
Climbing Speed: 10mm/Second;
Move Method: Attached Lifting Scaffolding;
Construction Properties: Building Scaffold;
Erection Position: External Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
After-sales Service: One-Stop Service;
Warranty: One Year;
Material: Steel;
Type: Climbing Formwork;
Height of Bracket: 12-17 Meters;
Height of Climbing: 3-6m;
Application: High Rise Building/Bridge Pier/Shear Wall;
Climbing Speed: 10mm/Second;
Move Method: Attached Lifting Scaffolding;
Construction Properties: Building Scaffold;
Erection Position: External Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
After-sales Service: One-Stop Service;
Warranty: One Year;
Material: Steel;
Type: Climbing Formwork;
Height of Bracket: 12-17 Meters;
Height of Climbing: 3-6m;
Application: High Rise Building/Bridge Pier/Shear Wall;
Climbing Speed: 10mm/Second;
Move Method: Attached Lifting Scaffolding;
Construction Properties: Building Scaffold;
Erection Position: External Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
After-sales Service: One-Stop Service;
Warranty: One Year;
Material: Steel;
Type: Climbing Formwork;
Height of Bracket: 12-17 Meters;
Height of Climbing: 3-6m;
Application: High Rise Building/Bridge Pier/Shear Wall;
Climbing Speed: 10mm/Second;
Move Method: Attached Lifting Scaffolding;
Construction Properties: Building Scaffold;
Erection Position: External Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Supplier Name

Qingdao Scaffolding Import and Export Co., Ltd.

Diamond Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

Diamond Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

Diamond Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

Diamond Member Audited Supplier

YANCHENG LIANGGONG FORMWORK CO., LTD.

Diamond Member Audited Supplier