Specification |
Sorbent: Silica Gel;
CAS No.: 0009;
Einecs: 33f794;
Shape: Card;
Drying Method: Color Change;
Kind: Chemical;
Packing: 200PCS/Can;
|
Material: PP;
Application: Medical, Household, Electronics, Automotive;
Shaping Mode: Injection Mould;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Runner: Hot Runner;
Design Software: Ug;
Installation: Fixed;
Standard: Hasco;
Customized: Customized;
Surface Finish Process: Texture or High Gloss Polishing;
Mould Cavity: Single Cavity or Muti Cavity;
|
Material: ABS;
Application: Medical, Household, Electronics, Automotive;
Name: Plastic Storage Box;
Mold of Steel Suppliers: Finkl, Assab, Daido, Lkm, Buderus;
Ejection System: Stripper Plate, Lifter, Push Bar, Ejection Pin etc;
Material of Steel: M2, Skh-9, Skh-51, M35, M42, etc;
Mould Life: >300K Shots;
Shipping Packing: Wood Case or Carton Box;
Lead Timelead Time of First Samples: Around 4~7weeks;
Export Country: Janpan, Europe, USA, Mexico, etc;
|
Material: PC;
Application: Medical, Household, Electronics, Automotive;
Product Name: Plastic Molding Parts;
Product Material: ABS, PVC, PC, PMMA, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|
Material: PP;
Application: Medical, Household, Electronics, Automotive;
Product Name: Custom Plastic Injection Molds;
Product Material: ABS, PVC, PC, PE, POM, PA, TPU, etc.;
Sample Confirm: We Will Send The Trial Samples to Customers Before;
Quotation: According to Samples, Drawing and Specific Require;
Gate Type: Pin Point Gate, Edge Gate, Side Gate, Sub Gate;
Mould Material: P20/718/738/Nak80/S136;
Main Thechnology: Milling, Grinding, CNC, EDM, Wire Cutting, etc;
Weekly Report: We Will Update The Mold Schedule Every Week;
Sofeware: CAD, PRO-E, Ug, Rhinoceros etc.;
Lead Time of First Samples: Around 4~7weeks;
|