Specification |
After-sales Service: Yes;
Warranty: 12 Months After Installation;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
Warranty: 1 Year;
Type: Coating Production Line;
Coating: Powder Coating;
Substrate: Metal Powder;
Condition: New;
|
After-sales Service: Yes;
Warranty: 12 Months;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Thickness: 0.12-2.0mm;
Width: 700-1550mm;
Speed: 60-200mpm;
Capacity: 60000-300000mts;
Raw Material: Cr Coils;
|
After-sales Service: Yes;
Warranty: 12 Months;
Type: Coating Production Line;
Coating: Coil Coating;
Substrate: Steel;
Condition: New;
Delivery Time: 3-5 Months;
Coils: Al, Ss, Cr, Gi, Gl;
Speed: 30-280mpm;
Thickness: 0.12-1.5mm;
Width: 700-1550mm;
|
After-sales Service: Yes;
Warranty: Yes;
Type: Coating Production Line;
Coating: Galvanized;
Substrate: Steel;
Condition: New;
Heating Method: Electric, Natural Gas, Oil;
Operation Mode: Automatic;
Material of Kettle: Steel Xg08, Ceramic;
Material of Tank: PP, Granite;
Installation: Concluded as Customer Required;
Application: Bridge and Highway, Industry, Construction;
Delivery Term: Fob CIF CNF;
OEM, ODM: Available;
|