Specification |
Standard: ANSI, DIN, GB, GOST, BSW;
Type: Welding Flange;
Material: Stainless Steel;
Structure: Flanges;
Connection: Welding;
Sealing Surface: Customizable;
Manufacturing Way: Forging;
Production Period: in 15-60 Days Upon Order Quantity;
Applications: Petroleum, Chemical, Machinery, Boiler;
MOQ: 1PCS;
Certificates: CE/ ISO / SGS / BV;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Slip on,Weld - Neck,Blind,Socket - Weld,Threaded,R;
Material: Carbon Steel /Stainless Steel;
Structure: Flanges;
Connection: Threaded/Welding;
Sealing Surface: RF/FF/Rtj;
Manufacturing Way: Forging;
Finish: Plain, Zinc Plated, Rust Preventive Oil;
Shape: Round;
Surface: Black,Golden,Polishing,etc;
Types: Po So Wn Bl Sw Th Pj/Se Pj/Rj;
Delivery Time: 15-30 Days After Dwon Payment;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Slip on,Weld - Neck,Blind,Socket - Weld,Threaded,R;
Material: Carbon Steel /Stainless Steel;
Structure: Flanges;
Connection: Threaded/Welding;
Sealing Surface: RF/FF/Rtj;
Manufacturing Way: Forging;
Finish: Plain, Zinc Plated, Rust Preventive Oil;
Shape: Round;
Surface: Black,Golden,Polishing,etc;
Types: Po So Wn Bl Sw Th Pj/Se Pj/Rj;
Delivery Time: 15-30 Days After Dwon Payment;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Slip on,Weld - Neck,Blind,Socket - Weld,Threaded,R;
Material: Carbon Steel /Stainless Steel;
Structure: Flanges;
Connection: Threaded/Welding;
Sealing Surface: RF/FF/Rtj;
Manufacturing Way: Forging;
Finish: Plain, Zinc Plated, Rust Preventive Oil;
Shape: Round;
Surface: Black,Golden,Polishing,etc;
Types: Po So Wn Bl Sw Th Pj/Se Pj/Rj;
Delivery Time: 15-30 Days After Dwon Payment;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW;
Type: Slip on,Weld - Neck,Blind,Socket - Weld,Threaded,R;
Material: Carbon Steel /Stainless Steel;
Structure: Flanges;
Connection: Threaded/Welding;
Sealing Surface: RF/FF/Rtj;
Manufacturing Way: Forging;
Finish: Plain, Zinc Plated, Rust Preventive Oil;
Shape: Round;
Surface: Black,Golden,Polishing,etc;
Types: Po So Wn Bl Sw Th Pj/Se Pj/Rj;
Delivery Time: 15-30 Days After Dwon Payment;
|