Steel Plank
US$10.00-10.50 / Piece
View
  • Recommend for you
  • What is Factory Supply Adjustable Galvanized Steel Props Scaffolding Steel Shoring Prop
  • What is Construction Scaffolding Prop Adjustable Shoring Prop Jack Post in Building
  • What is 90 Degree Load Capacity Scaffold Cast Double Clamp Coupler

What is Cuplock Scaffolding Steel Plank/Platform/Metal Deck/Board

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

500-999 Pieces US$10.50

1,000+ Pieces US$10.00

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Planks
  • Construction Properties Building Scaffold
  • Transport Package Woven Bags with Pallets
  • Specification 1088*320mm
  • Trademark FF
  • Origin Rizhao Shangdong
  • Size 228*63.5*1.8mm
  • Raw Material Steel
  • Sureface Pre-Galvanzied
  • Item System Scaffold Plank
  • Payment T/T
  • Delivery 30 Days After Confirmation
  • Package Pallets

Product Description

Steel Plank for System Scaffolds (FF-1000) Detailed Photos Product Parameters Material: Q235 Size 1088*320mm Weight: 8.63kg Brand number FF-1000 Surface treatment: HDG/EG Standard: EN74 Main market: America, Europe, Australia Africa, Asia and mideast Quality: Durable, ...

Learn More

Steel Plank Comparison
Transaction Info
Price US $ 10.00-10.50/ Piece Negotiable Negotiable Negotiable Negotiable
Min Order 500 Pieces 1000 Pieces 10000 Pieces 1000 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Management System Certification OHSAS/ OHSMS 18001 ISO 9001, ISO 9000, ISO 14001, BS 25999-2 ISO 9001, ISO 9000, ISO 14001, BS 25999-2 ISO 9001, ISO 9000, ISO 14001, BS 25999-2 ISO 9001, ISO 9000, ISO 14001, BS 25999-2
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Size: 228*63.5*1.8mm;
Raw Material: Steel;
Sureface: Pre-Galvanzied;
Item: System Scaffold Plank;
Payment: T/T;
Delivery: 30 Days After Confirmation;
Package: Pallets;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface: Hot DIP Galvanized;
Frame Type: H Frame Scaffolding;
Clients: Peri Formwork;
Usage: Hi Load Formwork Concrete;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Suspended Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Installation Scaffold;
Standard: BS1139, En74, As15763;
Finishing: E-Galvanized, HDG;
Usage: Oil Gas Petroleum, Offshore, Shoring, Construction;
Joint: Scaffolding Pipes Scaffold Tubes;
System: Tube and Clamp, Suspended, Access Scaffolding;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Single Row Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Installation Scaffold;
Size: Prop Size 0-4;
Surface: Painted/Galvanized;
Material: Steel;
Type: Mobile;
Structural Style: Doors Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: Internal Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Finishing: Powder Coated/Hot DIP Galvanized;
Lock Pin: Flip Lock/Fast Lock/V Lock/C Lock;
Scaffolding Planks: 19"X7'/19"X10';
Supplier Name

Rizhao Fast & Fasten Scaffold Co., Ltd.

China Supplier - Gold Member Audited Supplier

Nanjing Wellmade Metalwork Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Nanjing Wellmade Metalwork Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Nanjing Wellmade Metalwork Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Nanjing Wellmade Metalwork Co., Ltd.

China Supplier - Diamond Member Audited Supplier