Kwikstage Scaffolding
US$1,033.00-1,059.00 / Ton
View
  • Recommend for you
  • What is Hot Sale Painted AS/NZS1576 Aus Kwikstge Scaffolding Parts Tie Bar
  • What is Glavanized Cuplock Scaffolding System Parts Immediate Transom
  • What is Pin Type Frame Scaffolding for Euro Italy Facade Scaffolding

What is Mobile Metal Board/Planks for Kwikstage/Quickstage Scaffolding System for Australia for Sale Prepainted

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10000 Tons US$1,033.00-1,059.00 / Ton

Sepcifications

  • After-sales Service 2years
  • Warranty 2years
  • Material Steel
  • Type Fixed
  • Structural Style Soffit Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Single Row Scaffolding
  • Erection Position External Scaffolding
  • Move Method Lifting Bridge
  • Scaffolding Part Type Scaffolding Planks
  • Construction Properties Building Scaffold
  • Transport Package Steel Pallet
  • Specification 3METER
  • Trademark WEIYE
  • Origin Rizhao

Product Description

Component Name Sizes Finishing Unit Weight (kg/pc) Kwikstage Scaffolding Steel Board 1.8mmx230mmx63mmx2400mm Pregalvanized 14.6 Kwikstage Scaffold Steel Plank 1.8mmx230mmx63mmx1800mm Pregalvanized 11.6 Kwikform Scaffold Steel Walk board 1.8mmx230mmx63mmx1200mm Pregalvanized 8 ...

Learn More

Kwikstage Scaffolding Comparison
Transaction Info
Price US $ 1,033.00-1,059.00/ Ton US $ 1,100.00-1,500.00/ Set US $ 1,100.00-1,500.00/ Set US $ 1,100.00-1,500.00/ Set US $ 9.00-15.00/ Piece
Min Order 10000 Tons 1 Sets 1 Sets 1 Sets 5000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal
Quality Control
Management System Certification ISO 9001 - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand, Others OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
After-sales Service: 2years;
Warranty: 2years;
Material: Steel;
Type: Fixed;
Structural Style: Soffit Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Single Row Scaffolding;
Erection Position: External Scaffolding;
Move Method: Lifting Bridge;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Aluminium;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Ringlock Scaffoldingaluminium Scaffolding;
Construction Properties: Installation Scaffold;
Steel Grade: Aluminium6130;
Height: 4-11m;
MOQ: 1 Set;
Delivery Time: 15days;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Aluminium;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Ringlock Scaffoldingaluminium Scaffolding;
Construction Properties: Installation Scaffold;
Steel Grade: Aluminium6130;
Height: 4-11m;
MOQ: 1 Set;
Delivery Time: 15days;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Aluminium;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Ringlock Scaffoldingaluminium Scaffolding;
Construction Properties: Installation Scaffold;
Steel Grade: Aluminium6130;
Height: 4-11m;
MOQ: 1 Set;
Delivery Time: 15days;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Building Scaffold;
Steel Grade: Q195/ Q235;
Color: White, Red, Blue, Yellow;
MOQ: 1000PCS;
Length: 1.7-3.1/2.2-4.0/2.5-4.8m;
Supplier Name

Rizhao Weiye Tools Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier