Specification |
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Cold Drawn;
Grade: 3000 Series;
Temper: O - H112;
Surface Treatment: Polished Brushing Oxidized Mill Embossed Coated;
Alloy: Alloy;
Thickness: 0.2-100mm;
Wight: 20-1900mm;
Length: Customized Cut or in Coil;
Series: 1000-9000 Series;
Alloy Material: Cu Mn Si Mg Zn;
Ingot: More Than 5000 Tons in Stock;
Film: Blue PE Film Covering;
Processing: Pattern Plate Coil, Tube, Aluminum Extrusions;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 3000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Name: Aluminum Sheet;
Surface: Mill Finish/Mirror Finish;
Thickness: 0.3-20mm;
Width: 30-2600mm;
MOQ: 3 Tons;
Delivery Time: About 15 Days;
Length: as Customer's Requirement;
Packing: Export Wooden Pallets, Craft Paper, Anti-Blushing;
Standards: ASTM-B209. En573-1, GB/T3880.1-2006;
Property: Anti-Corrotion, Heat Resistant;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Thickness: 0.2-500mm;
Width: 20-3000mm;
Length: <=12000mm;
Date of Shipment: 15-20 Days After The Deposit;
MOQ: 1 Ton;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 6000 Series;
Temper: O - H112;
Surface Treatment: Polished;
Alloy: Alloy;
Processing Service: Bending, Decoiling, Welding, Punching, Cutting;
Material: 1050/1060/1070/1100/3003/5052/5083/6061/6063;
Shape: Round Roll;
Delivery Time: 8-12 Days;
Tolerance: ±0.5%;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Thickness: 0.2-500mm;
Width: 20-3000mm;
Length: <=12000mm;
Date of Shipment: 15-20 Days After The Deposit;
MOQ: 1 Ton;
|