Specification |
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Cold Drawn;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Name: Aluminum Sheet;
Surface: Mill Finish/Mirror Finish;
Thickness: 0.3-20mm;
Width: 30-2600mm;
MOQ: 3 Tons;
Delivery Time: About 15 Days;
Length: as Customer's Requirement;
Packing: Export Wooden Pallets, Craft Paper, Anti-Blushing;
Standards: ASTM-B209. En573-1, GB/T3880.1-2006;
Property: Anti-Corrotion, Heat Resistant;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Hot/Cold Rolled;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Polished;
Alloy: Non-alloy;
Samples: Available;
Delivery Time: 15-21 Days;
Tolerance: +/-1%;
Thickness: 0.1-30mm;
Processing: Bending, Decoiling, Welding, Punching, Cutting;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Industry;
Technique: Cold Drawn;
Grade: 1000, 2000, 3000, 5000, 6000, 7000 Series;
Temper: T3 - T8;
Surface Treatment: Polished;
Alloy: Alloy;
Model No.: 1050 1060 1100 2014 2024 3003 5052 5083 6061 6063;
Thickness: 0.5-12mm;
Width: 600-2000mm;
Length: 1000-6000mm;
Sample: Freely Provided;
Inner Diameter: 75, 150, 200, 300, 505mm etc.;
MOQ: 1 Ton;
Price: Fob CIF CFR EXW DDU DDP;
Payment Term: 30% Deposit + 70% Balance T/T;
Surface Processing: Color Coated, Sand Blasting, Brushing, Polishing;
|
Color: Silver;
Application: Beverage Packaging, Metal Packaging;
Technique: Cold Drawn;
Grade: 5000 Series;
Temper: H14, H16, H18, H19, H49;
Surface Treatment: Coated;
Alloy: Alloy;
Can Stock: 3104, 5052, 5182;
Bottle Lids Stock: 8011;
Can Tab Stock: 5182;
Thickness: 0.2-0.45mm;
|
Color: Silver;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Coated;
Alloy: Alloy;
Tolerance: +/-1%;
Width: 0.2mm-5.0mm or Customized;
Thickness: 0.2mm-6.0mm;
Package: Customer Specified;
Delivery Time: 15-21 Days;
Alloy or Not: Is Alloy;
|